Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />o <br />.... <br />...., <br />C'.l <br />c> <br /> <br />totaled only 17,666 ac...e-feet fo... the yea.... This was only 43 percent of <br />the average 41,500 ac...e-feet annually diverted. <br /> <br />August precipitation and inflow at Lake Estes we...e nea... normal at <br />91 pe...cent of average and 93 percent of average, respectively. Total <br />p...ecipitation fo... the water year (October-September) was 14.95 inches 0'" <br />87 percent of average. The inflow above Lake Estes was 62,400 ac...e-feet <br />for water year 1989 and this was only 69 percent of average. <br /> <br />Estes Powe...plant generation totaled 122,200,000 kilowatt-hours fo... the <br />water yea... and was nea...ly 15,500,UOO kilowatt-hours above ave...age. <br />Thi s was due to the above-average Adams Tunnel di vers ions wh i ch were <br />118 percent of average. <br /> <br />Carte... Lake <br /> <br />Completed in 1952 wi th three dams, Ca...te... Lake has a total storage <br />capacity of 112,2UO acre-feet. Inflow of project water to Ca...ter Lake <br />is f...om the Flati...on Pumping Plant with a capacity of about 400 ft3/s. <br /> <br />Carter Lake storage content at the beginning of the wate... year was <br />84,295 acre-feet which was above the 30-year average of 50,800 ac...e-feet. <br />Project water deliveries to the St. Vrain Canal continued through the <br />end of Octobe..., and totaled 6,823 ac...e-feet fo... the month. <br /> <br />Continuous pumping to Ca...ter Lake from Flatiron Reservoir continued <br />until late October to accommodate scheduled Charles Hansen Feeder <br />Canal(550 ft3/s section) maintenance during the October 1 to Octobe... 14 <br />peri od. Pumpi ng to Ca...ter Lake was shut down on Octobe... 25 due to the <br />high deliveries (500 ft3/s) to the Big Thompson River. Pumping <br />continued on Novembe... 2, and this b...ought Carte... Lake storage to the <br />maximum fo... the wate... year of 112,321 ac...e-feet on Decembe... 21. This <br />was 0.08 feet above the normal maximum ope...ating level of 5759.00 feet. <br /> <br />All early fi 11 of Ca...ter Lake by the end of December 1988 <br />allow for scheduled maintenance on the pressure tunnel. <br />tunnel was shut down from December 21, 1988, to June <br />pressure tunnel lining repai..., grouting, and F1atiron <br />maintenance. <br /> <br />was planned to <br />The pressu...e <br />15, 1989, for <br />Unit 3 annual <br /> <br />Irrigation delive...ies to the St. Vrain Canal began in early Apr-il. A <br />total of 3,6U5 acre-feet was delive...ed in April and 16,521 ac...e-feet in <br />May, including mete...ed delive...y. Water deliveries fo... June we...e much <br />above no...mal at 9,700 acre-feet. Pumping to Carte... Lake began a9ain on <br />June 15 and was scheduled as necessary to maintain the lake at a <br />desi...able ope...ating level. <br /> <br />Project wate... del iveries were much above ave...age in July at <br />33,OUO acre-feet, which was 202 percent of average. The end of water <br />year sto...age of 36,450 acre-feet was 14,350 acre-feet below no...mal. <br /> <br />Water year deliveries to the St. Vrain Canal totaled 100,400 acre-feet, <br />much above the 30-yea... average of 61,000 acre-feet. <br /> <br />Flatiron Unit 3 generation was not scheduled du...ing the water yea... due <br />to high P...oject deliveries. A total of only 33 acre-feet was delive...ed <br /> <br />13 <br />