My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03377
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:05 PM
Creation date
10/11/2006 11:41:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.200
Description
Narrows Unit - Mailing Lists and Correspondence
State
CO
Basin
South Platte
Water Division
1
Date
3/3/1949
Author
unknown
Title
Narrows Unit South Platte District Missouri Basin Project questions and answers
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'~ <br /> <br />. <br /> <br />29g8 <br /> <br />m~y not be considered feasible. There are certain factors which might <br />render the generation of hydroelectric power at l~arrows site attractive <br />on (1. system basis in that peak g;enemtiol1 below the Narrows Dam would <br />probably occur during the summer period when reservoir reler.ses and all <br />wa ter requi red to pass on down the river would be av:\il::\ ole for power <br />g;eneration. These peak flows would coinoide with the lfnximum pumping <br />demClnd which is quite extensive in the vicini t-.f of Fort Mor[;c.n. When <br />interconnection to other powe~ systems is considered, the ubility to <br />generate this power close to the load center for this seasonal de=r.d <br />may prove the installo.tion of a powerphnt to oe 'oore desirClble than <br />it would bo if the lor.d center were farthor romoved. <br /> <br />. <br /> <br />. <br /> <br />The last question given in the list concerns what justificatio:l., <br />on the basis of current studies, CG.l'1 be given for each of the enumerc~tod <br />purposes for which the No.rrows D~m will be constructed. Tile "nswor to <br />this ~lesticn is best civen by a reperusal of the r.nswers to all the <br />questions given above. <br /> <br />All .stu~i>>s .1.nd df\t~ on t:le project will be co:n~)18ted in project <br />report form ~Ul.d will also be co!~solid['ted in tl,8 comprehensive b:.'.sin <br />re:;)Ort on tho South Platte B[',sin. In tho m0~l.ntime, nll do.ta ::tre ::\v\.~il- <br />c.blo fDr inspection C!nd "tady b:,' arrc.ngeE1cnt with the South PI,' tte iUver <br />DiGtrict .office, Buildinl; 10, Llonvcr t\;oor:.:d Center. Arr,:ngomcnts for <br />such in8pe0tion c.nd stud~" b~r r':)prC'scnt,~tivGs of' 10:::,.1 int~3rcsts will be <br />wel-,,;on18d. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.