My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03307
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:40 PM
Creation date
10/11/2006 11:39:10 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.600.10
Description
Big Sandy River Unit - Colorado River Salinity Control Program
State
WY
Basin
Colorado Mainstem
Date
1/1/1981
Title
Big Sandy River Unit Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER II <br /> <br />(JL';; <br />'-,'.,:. <br />-'~;;~. ;; <br /> <br />Event number <br /> <br />lO. <br /> <br />ll. <br /> <br />12. <br /> <br />-, <br /> <br />13. <br /> <br />l4. <br /> <br />GENERAL APPROACH TO THE WORK <br /> <br />Approximate date <br /> <br />7. <br /> <br />Meeting to review alternatives and environ- <br />mental data and develop additional alter- <br />natives, if necessary - - - - - - <br /> <br />Mid 1981 <br /> <br />8. Newsletter No. 2 Results of meeting to <br />review alternatives and environmental <br />data - - - - - - - - - - - - - - - - - - Late 1981 <br /> <br />9. <br /> <br />Letter and public notice of meeting to <br />identify a publics preferred plan and <br />notice of intent to prepare environmental <br />report - - - - - - - - - - - - - - - - - <br /> <br />Early 1982 <br /> <br />Meeting for public to identify a preferred <br />plan - - - - - - - - - - - - - <br /> <br />Early 1982 <br /> <br />Newsletter No. 3 Results of plan selection <br />by the planning team - - - - - <br /> <br />Early 1982 <br /> <br />Meeting to scope environmental issues <br /> <br />Mid 1982 <br /> <br />Newsletter No. 4 Results of environmental <br />scoping meeting - - - - - - - - - <br /> <br />Mid 1982 <br /> <br />Newsletter No. 5 Results of Phase I <br />Contract - - - - - - - - - - - - <br /> <br />Mid 1982 <br /> <br />l5. Newsletter No. 6 Completion of engineer- <br />ing and environmental data gathering - - - - Late 1982 <br /> <br />l6. <br /> <br />17. <br /> <br />18. <br /> <br />Newsletter No. 7 Complete Phase II <br />Contract - - - - - - - - - - <br /> <br />Mid 1983 <br /> <br />Public Notice of Hearing on environmental <br />report - - - - - <br /> <br />Early 1984 <br /> <br />Public Hearing on draft environmental report <br /> <br />Mid 1984 <br /> <br />19. Commissioner's news release - - - - - - - - - - Early 1985 <br /> <br />The public will be involved in the environmental scoping process. This <br />will be an open process continuing throughout the planning procedure as called <br />for by the CEQ regulations for identifying significant and insignificant <br />environmental issues related to the proposed action. The team will analyze <br />the input from the scoping process and select those issues deserving study in <br />the environmental report. The process is continuous and allows the public the <br />opportunity to respond throughout the course of the study. <br /> <br />l8 <br /> <br />L-' 1 ., <br />I 'I . t:-"') <br />.... Lv... <br />
The URL can be used to link to this page
Your browser does not support the video tag.