Laserfiche WebLink
<br /> <br />( <br /> <br />( <br /> <br />3. Operation and Haintenance and Rep1<1cement <br /> <br />The Annual Op-eration, Maintenance, and Replacement Costs for the <br /> <br />U~compahgre Project irrigntion delivery system for the year" 1971 through 1980 <br />inclusive is listed below. The average annual rate of increase is about 25 <br /> <br />percent for the past five years. <br /> <br />Table IV <br /> <br />Uncompahgre Valley OH&R Costs <br />Year Operation Maintenance <br />TIn 98;000 254,000 <br />1972 120,000 246,000 <br />1973 113,000 282,000 <br />1974 118,000 347,000 <br />1975 125,000 327,000 <br />1976 150,000 303,000 <br />1977 184,000 345,000 <br />1978 213,000 408,000 <br />1979 247,000 583,000 <br />1980 229,000 812,000 <br /> <br />1971-1980 Inclusive <br />Adminis trative <br />99,000 <br />105,000 <br />109,000 <br />132,000 <br />146,000 <br />159,000 <br />185,000 <br />220,000 <br />286,000 <br />428,000 <br /> <br />Total <br />451,000 <br />471 ,000 <br />504,000 <br />597 ,000 <br />598,000 <br />612,000 <br />715,000 <br />841,000 <br />1,116,000 <br />1,469,000 <br /> <br />The items which could be impacted by implementation of the candidate plans <br /> <br />are: <br /> <br />Operation: <br /> <br />winter stock water <br /> <br />Maintenance: weed and brush control <br />silt removal <br />road maintenance <br />canal bank repair <br />structure repair <br />equipment costs <br /> <br />It is anticipated that the variance of the costs of these items will <br /> <br />parallel the overall varIance of all OM&R costs in the "Future Without" <br /> <br />condition. Forecasting future OH&R cos ts appears highly speculat ive. HO'Never, <br /> <br />a linear extrapolation of total OM&R costs based on the listed ten years of <br /> <br />record indicates an average rate of increase of about fourteen percent per year. <br /> <br />A linear extrapolation appears to be appropriate since the procedure will dampen <br /> <br />out effects of sudden increases in costs ~lich reflect infrequent major repairs or <br /> <br />need for rehabilitation and betterment programs. Periodic Rehabilitation and <br /> <br />Betterment programs lH;ve been \lsed in the Uncompahgre Project to <br /> <br />keep rap id 1y <br /> <br />001662 <br /> <br />escalating maintenance costs at acceptable rate~ of increase. <br />