My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03271
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:31 PM
Creation date
10/11/2006 11:37:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.700
Description
Colorado River Basin Salinity Control - Federal Agency Reports - GAO
Basin
Colorado Mainstem
Water Division
5
Date
3/29/1995
Title
Water Quality - Information on Salinity Control Projects in the Colorado River Basin - Report to Congressional Requesters
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8.259297 <br /> <br />W <br />VI <br />..r.~ <br />""-1. <br /> <br />Table 1: BOR's Salinity Control Project Activities Through Fiscal Year 1994 <br /> Total cost <br /> Expenditures when <br /> through fiscal completed <br /> year 1994 (dollars (dollars In <br />Project Status Project activity In mllllone) millions)' <br />Meeker Dome (Colorado) Completed Plugged three oil wells $3 $3 <br />Las Vegas, Pittman Bypass Completed Constructed a 4-mile pipeline <br />(Nevada) 2 2 <br />Paradox Valley Completedb Injected brine about 3 miles <br />(Colorado) beneath the surface 64 67 <br />Grand Valley Under construction Lining about 45 miles of <br />(Colorado) canals; replacing 338 miles of <br /> laterals with pipe 136 159 <br />McElmo Creek Under construction Lining about 34 miles of <br />(Colorado) laterals; replacing 7 miles of <br /> laterals with pipe 38 39 <br />Lower Gunnison Basin: Winter Under construction Replacing a winter watering <br />Water (Colorado) system for livestock with 140 <br /> miles of pipe 23 25 <br />Lower Gunnison Basin: East In planning' Combining laterals; replacing <br />Side Laterals laterals with pipe <br />(Coiorado) 0 53 <br />San Juan- Hammond In planning' Lining 20 miles of canal and 7 <br />(New Mexico) miles of laterals 0 12 <br />Uintah Basin In planning' Lining over 55 miles of canals <br />(Utah) and laterals 0 29 <br />Price-San Rafael (Utah) In planning' Installing 97 miles of pipe <br /> laterals 0 78 <br />Total $266 $467 <br /> <br />6The total cost does not include annual operations and maintenance costs. <br /> <br /> <br />bThis project was completed in 1994 and is being tested to operate in 1995. <br /> <br /> <br />crhis project has been authorized but construction has not yet begun. <br /> <br />dThese projects have not yet been authorized. <br /> <br /> <br />Source: BOR. <br /> <br />Page 6 <br /> <br />GAOJRCED-95-58 SalinIty Control ProjecUl in the Colorado River Basin <br />
The URL can be used to link to this page
Your browser does not support the video tag.