Laserfiche WebLink
<br />B-259297 <br /> <br />w <br />c..n <br />~ <br />0) <br /> <br />ceiling, according to a BOR official, funds may be allocated among the <br />various projects as needed. <br /> <br />By the end of September 1994, BOR had completed construction on three <br />salinity control projects, at a combined cost of about $69 million. <br />Construction was under way on another three projects, and the remaining <br />four projects were in various stages of planning. CAppo I describes the 10 <br />projects.) According to BOR program managers, completing the unfinished <br />and currently planned projects will cost about $200 million. Table 1 <br />summarizes the status and construction cost of BOR'S 10 projects; figure 1 <br />shows the projects' locations in the Colorado River Basin. <br /> <br />Page 5 <br /> <br />GAOIRCED.95-58 Salinity Control Projects in the Colorado River Basin <br /> <br />