My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03251
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:26 PM
Creation date
10/11/2006 11:37:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.30
Description
CRSP
Basin
Colorado Mainstem
Date
3/11/1964
Author
CWCB
Title
March 1964 CWCB Board Memo RE: CRSP
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NO.3 <br /> <br />MIDDLE PARK PROJECT <br /> <br />1. Location and water source: Upper Colorado River basin (Grand <br />County). Williams River, East <br />Troublesome Creek and Muddy Creek. <br /> <br />2. Estimated Cost: <br /> Rabbit Ear Unit <br /> Troublesome Unit <br /> Total Cost <br /> Cost allocated to <br /> irrigation <br />3. Irrigated acreage, <br /> Rabbit Ear <br /> Troublesome <br /> Total irrigated <br /> acreage <br />4. Average cost per acre, <br />5. Average annual additional stream depletion, <br /> Rabbit Ear <br /> Troublesome <br /> Total stream <br /> depletion <br />6. Average annual additional stream depletion per <br /> acre of irrigated land, <br /> <br />7. Benefit-cost ratio, <br />Rabbit Ear <br />Troublesome <br /> <br />$ 5,300,000 <br />6,000,000 <br />$11,300,000 <br /> <br />10,000,000 <br /> <br />19,190 <br />13 , 640 <br /> <br />32,830 acres <br /> <br />$305. <br /> <br />16,400 <br />13,000 <br /> <br />29,400 a.f. <br /> <br />.90 a.f. <br /> <br />1. 3 to 1 <br />1. 2 to 1 <br /> <br />Average benefit-cost <br />ratio 1.25 to 1 <br /> <br />The above summary of the Middle Park Project is based <br />upon a status report of 1954. No current information is available. <br />In the status report the Rabbit Ear and Troublesome units were <br />treated as separate projects. However, since they are in the same <br />immediate area, it is our opinion that they should be consolidated <br />into a single project and we have accordingly done so. It was our <br />original intention to include the Parshall unit within the frame- <br />work of the Middle Park Project. After further analysis and con- <br />sideration, however, we have eliminated the Parshall unit from our <br />
The URL can be used to link to this page
Your browser does not support the video tag.