My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03234
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:20 PM
Creation date
10/11/2006 11:37:22 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.02
Description
San Juan River Recovery Implementation Program - Recovery Plans & Information
Basin
San Juan/Dolores
Water Division
7
Date
10/29/1991
Title
San Juan River Recovery Implementation Program - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(., <br />~, <br />~ <br />~ <br /> <br />. <br /> <br />~ <br /> <br />for overall program coordination and dissemination of information about <br />program activities. The Service will appoint a senior level biologist <br />familiar with Colorado River fishes to participate on the biological committee <br />and to serve as staff support to that group. <br /> <br />4.4 PROCEDURES AND APPROVALS <br /> <br />Implementation of recovery elements would follow the general process outlined <br />below: <br /> <br />A. Long range plan <br /> <br />(1) The program coordinator in cooperation with program participants <br />or other interested parties will develop the draft 7-year plan and <br />priorities for the six recovery elements <br /> <br />(2) The draft plan will be reviewed by the Biology Committee and <br />modified as appropriate <br /> <br />(3) The draft plan will be sent to the Oversight Committee for review <br />and final approval <br /> <br />(4) Long range plan will be updated annually through process described <br />above in (1), (2), and (3) <br /> <br />B. Annual Work Plan <br /> <br />(1) The program coordinator will identify individual projects that are <br />needed to accomplish the long range plan for each of the six <br />recovery elements <br /> <br />(2) The program coordinator will draft an annual work plan consisting <br />of high priority individual projects. The annual program will <br />reflect available funding <br /> <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.