My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03221
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:17 PM
Creation date
10/11/2006 11:36:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.100
Description
Colorado Big Thompson Project - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1950
Title
The Colorado - Big Thompson Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br /><.> <br />>- <br /> <br />co <br /> <br /> <br />1<.:ast Portal - Alva. B. Adams Tunnelo <br /> <br />When the two headings met under the Contlrumtal. D1 vide, the <br />difference in alignment and gr'ftde closure could be covered by a 25- <br />cent piece. Temperatures in the twmel varied ......ith the depth or <br />ground cover--maximum approx~tely 4,000 feet--and ranged from <br />46.40 F. near the portals to a high of 76.60 F. six miles in from <br />the east portal. Constructed on a slope of .00155 for a difference <br />of 107 feet in elevation bet......een portals, the tunnel Is concrete- <br />lined throughout and has a capacity of approxi1na.tely 355 million <br />gallons per day. Construction required )08,563 cubic yards of <br />excavation, 4,280,728 pounds of steel, and 124,411 cubic yards of <br />concrete. Tunnel flo~s are regulated by two 9-foot by IO-foot <br />radial gates operated fram the gatehouse at the ~st portal or by <br />reJ::lote control .from the Granby Pumping Plant. <br /> <br />Excavation f'rGI.:1 the east portal r~quir~d 3 7~ months, an average <br />of 1,146 f~~t being driven each month. Tho ..est portal contractor <br />,;orked 31 mont.hs end averaged 833 feet per month. A maxiI:1um of 74 <br />feet was driven in one 24-hour period. <br /> <br />A gmall reservo~' at the east portal serves as a stilling pool <br />to regulate tunnel discharges prior to tho::1r rel.ease into thtt Estes <br />Park Aqueduct and Power SysteI:l at the Aspen Creek Siphon. <br /> <br />A pipe-enclosed electrical conduit suspended fr~ the tunnel <br />roof above the nOl~ water surface COnnBcts Eastern and Western <br />Slope tran~~ission circuits of the project. This conduit consists <br />
The URL can be used to link to this page
Your browser does not support the video tag.