My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03221
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:17 PM
Creation date
10/11/2006 11:36:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.100
Description
Colorado Big Thompson Project - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1950
Title
The Colorado - Big Thompson Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'7': <br /> <br />.-:; <br />.- <br /> <br />c.n <br /> <br /> <br />~ <br /> <br />"- <br />-' <br /> <br />Recreation. <br /> <br />Summary of Construction ProHress <br /> <br />The first large unit of work undertaken on the Western Slope <br />was construction of the Green Mountain Dam and Powor Plant. These <br />features vere completed and placed in operation on ~my 18, 1943. <br />This ....as followed by cOI:1pletion of the Alva B. Adams Tunnel and. <br />Shado.... Mountain Dam. Construction of GrBIlby Dam and Dikes, started <br />in 1942 but stopped for the duration of the war, has been completed <br />and the contract for construction of the Granby Pumping Plant, <br />a....arded in 1947, is nearing completion. The 2.2-mile Granby CB.IlB.l <br />has been completed. Work on Colorado River ImproveIl'Wnts has been <br />carried on concurrently ....ith other Western Slope features. <br /> <br />On the Eastern Slope, aqueduct features betveen the Alva B. <br />Adams Tunnel and Lake Estes have been completed and the construc- <br />tion of ~~ys Lake and Estes Po....er Plants is nearing completion. <br />Lake Estes and Olympus Dam on the Big TIlampson River ....ere completed <br />in 1949 and construction of Olympus Siphon and the Olympus and Pole <br />Hill Tunnels is in progress. Horsetooth Reservoir and Dams end <br />four tunnels for the Rorsetooth Feeder Canal have been campleted. <br />Construction is also under way on canal sections linking the <br />tUlUlels, on the Horsetooth Suppl:,." Conduit, and on the Poudre Supply <br />Canal. Construction of the Carter Lake Pressure Tunnel and Carter <br />Lake Dams Nos. 1, 2, and 3 is scheduled to start in 1950. <br /> <br />h <br />
The URL can be used to link to this page
Your browser does not support the video tag.