My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03199
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:08 PM
Creation date
10/11/2006 11:36:21 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.100
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1975
Title
1975 Demonstration Farms for Salinity Reduction on the Colorado River
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />In <br />c..._J <br />L'j <br /> <br />. <br /> <br />,.::;. <br /> <br /> <br />~! <br /> <br />.---. <br />'-.' <br /> <br />~/~, <br />,r7// " <br />,// .. <br />/ /1/ / ~ , :,. <br /> <br />, ,~. <br /> <br /> <br />. <br /> <br />,'.-'.... <br />> .j ~ <br />~~ 0, 0 <br /> <br />PICTURE NO. 2 <br /> <br />The cost of construction is about the same but those drops in <br />the ditch take a lot of time because they are hand formed. Also they <br />create a potential weakness in the structure where cracking is apt to <br />occur. <br /> <br />There are also two methods being used to place the ports within <br />the ditches. The first is to place those small metal gates on the <br />level and in the wet cement. as shown below. <br /> <br /> <br />Afterwards 2" Poly Ethlene pipes are cut <br />of the gates and through the ditch bank. <br /> <br />and made to fit over the ends <br />This process costs about $1.55 <br /> <br />- 16 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.