My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03180
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:02 PM
Creation date
10/11/2006 11:35:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.16.E
Description
UCRBRIP Technical Committee
State
CO
Basin
Colorado Mainstem
Date
1/1/1996
Author
UCRBRIP
Title
Draft 1997 Work Plan Review
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />COLORADO RIVER RECOVERY PROGRAM <br />FY-1997 PROPOSED SCOPE OF WORK <br /> <br />Project No.: l.. <br />(Use FY 96 #) <br /> <br />Lead Agency: <br />Submitted b,/: <br />Address: <br />Phone: <br />Fax: <br />E-mail: <br /> <br />U.S. Fish and Wildlife Service <br />Division of Water Resources <br />P.O, Box 25486 DFC, Denver, CO <br />(303) 236-5322. ext. 235 <br />(303) 236-4224 <br />George _ Smith@FWS,gov <br /> <br />April 26, 1996 <br /> <br />Date: <br /> <br />Ca1.egor-'l: <br />XOngoing project <br />_Ongoing-revised project <br />_Requested new proiect <br />_Unsolicited proposal <br /> <br />Fxrp-r::tpn F'lnrlino Snllrr:p.: <br />.Annual funds <br />_Capital funds <br />XOther (explain) <br /> <br />I. Title of Proposal: <br /> <br />Operation and Maintenance of the 15-Mile Reach Gage 1 ~~~-?OOO <br />ISection 7 Funds) <br /> <br />II. Relation to RIPRAP: <br /> <br />Colorado River Action Plan <br />I.A.3.c.(31Ia). Deliver Ruedi flows to the 15-Mile Reach. <br /> <br />III. Study Background/Rationale: <br /> <br />The gage is needed to ensure that water secured under the Program is delivered to <br />the 15-Mile Reach. Due to the ongoing nature of this activity the scope of work <br />has been set up as a, 6-year project to be reviewed annually, <br /> <br />IV. Study Goals; Objectives, and,End Products: <br /> <br />To provide a basis for refining the flow recommendations for the Reach. <br /> <br />To provide a benchmark for future monitoring by video or aerial photography. <br /> <br />To aid in scheduling releases from Ruedi and other water sources which may be <br />acqurred b,/ the Program. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.