My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03180
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:02 PM
Creation date
10/11/2006 11:35:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.16.E
Description
UCRBRIP Technical Committee
State
CO
Basin
Colorado Mainstem
Date
1/1/1996
Author
UCRBRIP
Title
Draft 1997 Work Plan Review
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />v. <br /> <br />Description of Past Performance: <br /> <br />The gage has been operated continuously since 1990. <br /> <br />VI. <br /> <br />Study Area: <br /> <br />1 5-Mile Reach of the Colorado River near Grand Junction. <br /> <br />VII. Study Method/Approach: <br /> <br />The Fish and Wildlife Foundation, via the Colorado Division of Wildlife <br />MOU # 14-16-0006-91-921. will contract with the U.S. Geological Survey for the <br />operation of the 15.Mile Reach gage installed by the Program in FY-90, Section 7 <br />funding, which are obtained from private sources and reside at the Foundation, <br />will be used as matching funds. <br /> <br />VIII. Task Description and Schedule: <br /> <br />A. Geological Survey will operate and maintain the 1 5-Mile gage installed in FY- <br />90 by the Program. <br /> <br />B. Geological Survey will produce daily flow and temperature records which <br />will be published in the annual water resource paper for Colorado, Data will <br />also be available from the data platform installed on the gage. <br /> <br />IX. Study Schedule: <br /> <br />FY 1997 - FY 2000 <br /> <br />Operation begins October 1, of each year, and continues through September 30. <br />of the following year. <br /> <br />X. <br /> <br />EY_199.LBudget: <br /> <br />Budget <br /> <br />(Section 7 Funds) <br /> <br />Labor <br />Total <br /> <br />E.1'_J_99_LWork: <br /> <br />$~ !'l!iO <br />$3,950 <br /> <br />The tasks remain unchanged from year to year. <br /> <br />Budget Estimate: <br />XI. BudgeLSummat.',': <br /> <br />FY 1997 <br />FY 1998 <br />FY 1999 <br />FY 2000 <br />Total <br /> <br />$3,950 <br /> <br />3,950 <br />4.050 <br />4,150 <br />47!iO' <br />$20,250 <br /> <br />'The operation and maintenance would be a recurring cost that increases $100 each year. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.