Laserfiche WebLink
<br />~ <br />....} <br />(,) <br />(,0 <br /> <br />Conservation and Recovery Act (RCRA). Inspections are made of: a) treatment, <br />storage and disposal sites and facilities; b) generators and transporters of <br />hazardous waste; c) non-notifiers and; d) closure and post-closure plans. <br />I <br /> <br />A manifest system is necessary to "track" hazardous wastes from sources of <br />generation through final treatment storage and disposal. The Department assists <br />EPA in inspections, surveillance, and monitoring pertinent to enforcement actions <br />to assure compliance with RCRA requirements. Sites that require Superfund clean-up <br />actions or other response measures are inventoried and prioritized. <br /> <br />Milestones Responsibility <br /> <br />Completion Date <br /> <br />Inspections: EPA/CDH <br />* Treatment, Storage and Disposal <br />Sites and Facilities <br />* Tra nsport er s <br />* Generators and Non-Notifiers <br />* Closure and Post-Closure. <br /> <br />Ongoing <br />(12 per month.) <br /> <br />Manifest System & Annual Report EPA/CDH <br />* Develop and maintain a manifest <br />system to assure control of hazardous <br />waste <br />* Notify EPA of violations and recommend <br />enforcement action. <br /> <br />December, 1982 <br /> <br />Enforcement <br />* Conduct inspections, monitoring and EPA/CDH <br />surveillance activities to assist EPA <br />in enforcement actions, in accordance <br />with procedures in the cooperative <br />arrangement. <br /> <br />Ongoing <br />(4 per month.) <br /> <br />Sub-Objective Three: Complete response measures associated with Section 6 of the <br />Lowry Landfill. <br /> <br />Rationale: Groundwater monitoring in the vicinity of Section 6 of the Lowry <br />Landfill site indicate response measures are needed. Appropriate response measures <br />will be determined and constructed to prevent additional contamination and correct <br />deficiencies to assure compliance. <br /> <br />Milestones <br /> <br />Responsibility <br /> <br />Completion Date <br /> <br />Review Reports and Plans for response <br />measures. <br /> <br />CDH/EPA <br /> <br />October, 1982 <br /> <br />Establish closure and post-closure <br />plan to monitor effectiveness of <br />response measures. <br /> <br />CDH/EPA <br /> <br />January, 1983 <br /> <br />-24- <br />