Laserfiche WebLink
<br />j <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />1',.) <br />.J:>. <br />en <br /> <br />The work on this phase calls for construction of the outlet <br /> <br />~:.. <br /> <br />works portion of the flood control dam. Major items consist of <br /> <br />165,000 cubic yards of common excavation; 60,000 cubic yards of rock <br /> <br />excavation; 1,600 cubic yards of riprap; 13,000 cubic yards of <br /> <br />reinforced concrete; 20,000 pounds of structural steel. and 800 <br /> <br />linear feet of 20-inch water line, including embankment control <br /> <br />gates, elevator, overhead crane and miscellaneous metals and mechan- <br /> <br />ical and electr.::.cal work.. <br /> <br />-2- <br /> <br />copied: CWCB/mm 4/5/68 <br />