My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03132
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:49 PM
Creation date
10/11/2006 11:32:56 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.400
Description
Platte River Basin - River Basin General Publications - Nebraska
State
NE
Basin
South Platte
Water Division
1
Date
3/1/1969
Author
Nebraska Soil and Wa
Title
Nebraskas State Water Plan - Status Summary - Volume I - Potential Projects
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CU3269 <br /> <br />CORPORATION GULCH WATERSHED <br /> <br />CORPORATION GULCH WATERSHED <br />SOIL CONSERVATION SERVICE <br /> <br />. <br /> <br />LOCATION: Northeastern Madison County - Includes part of Norfolk <br /> <br />SPONSORS: Madison County Sol I & Water Conservation District, The Norfolk Sanitary Drainage <br />District and the City of Norfolk <br /> <br />Table 2 - Reservoir Data <br /> <br /> <br />I <br />LEdEND <br />PROPOSED RESERVOIR <br />PROPOSED RECREATION AREA <br /> <br />d <br />1it <br /> <br />FEATURES: One Multiple-Purpose Floodwater Retarding structure and Basic Recreation Facilities <br /> <br />CONSTRUCTION PERIOD: 2 Years <br /> <br />AVERAGE ANNUAL COST: $40,760 <br />BENEFIT-COST RATIO: 3.2 to 1.00 <br /> <br />PROJECT LIFE: 50 Years <br /> <br />lilll.,Hl~:.illi <br /> <br />ANNUAL O. M. & R.: $21,740 <br />COSTS BASED ON: 1967 Prices <br />COST OF RIGHT-OF-WAY: $286,600 <br /> <br />PROPOSED <br />RECREATION AREA <br />, <br />, <br /> <br /> Table I - Prolect Benefits Costs and Renavment bv Source <br />Puroose Portion of Proiect Cost Federal Share Non-Federal Share <br />Flood Control $132,000 $104,100 $ 27,900 <br />Recreation 372.400 39,900 332,500 <br />Total $504,400 $144,000 $360,400 <br />Average Annua I Project Benefits: $ 131,730 <br /> <br />~ <br /> <br /> Storaoe Canaclt" (Acre-Feet) <br />Number of Structures Total Drainage Area Initial Sed Iment Flood Control Recreation <br /> Above Structures <br />1 1,440 acres 965 226 530 209 <br /> <br />~ <br /> <br />~ <br /> <br />I <br />EllKHORN <br />, <br />, <br /> <br />-..l~5" <br />~ <br /> <br />. <br /> <br />/- ) <br /> <br />o <br />I. <br /> <br />2 <br /> <br />miles <br />
The URL can be used to link to this page
Your browser does not support the video tag.