My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03132
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:49 PM
Creation date
10/11/2006 11:32:56 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.400
Description
Platte River Basin - River Basin General Publications - Nebraska
State
NE
Basin
South Platte
Water Division
1
Date
3/1/1969
Author
Nebraska Soil and Wa
Title
Nebraskas State Water Plan - Status Summary - Volume I - Potential Projects
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />prolect Costs <br /> <br />Land treatment costs tor the project amount to $37,300; structural measures - $151,200; <br />engineering services - $11,600; project administration - $17,700; and other costs Including the <br />land, easements and rlghts-ot-way - $286,600. <br /> <br />. <br /> <br />Flnanclnq Arran~ements <br /> <br />The City of Norfolk and the Norfolk Sanitary District would obtain the necessary land <br />rights. Taxation In support of this project would be levied under the city's Flood Control <br />Fund. Money for maintenance of recreation facilities would come from taxes levied under the <br />Park Department Fund. The Norfolk Sanitary Drainage District would levy a tax to provide <br />maintenance for the structure Itself. Approximately two mi I Is would be needed to amortize <br />the Investment and pay operation and maintenance costs. Some funds are anticipated through <br />the state of Nebraska Smal I Watershed Control Fund. <br /> <br />Provisions for Operation and Maintenance <br /> <br />The City of Norfolk and the Norfolk Sanitary Drainage District wi I I operate and maintain <br />the project facilities. <br /> <br />Local Interest and Support <br /> <br />Application for the project was fl led In August 1962. Since that time, great Interest <br />on the part of the sponsors has been sYldent. <br /> <br />Existlnq Resource Oevelopment In the Area <br /> <br />A local flood protection channel and levee project is being constructed around the north <br />and east sides of Norfolk by the Corps af Engineers to provide protection along the North Fork <br />of the Elkhorn River. <br /> <br />Effect on Water Supplv in Proiect Area <br /> <br />The project Is expected to reduce the sediment load delivered to the Elkhorn River. <br />Ground water, to be pumped Into the reservoir to maintain a recreation pool, Is not expected <br />to be significantly depleted. <br /> <br />~2 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.