Laserfiche WebLink
<br />CQ023; <br /> <br />CLATONIA CREEK WATERSHED <br /> <br />LOCATION: Gage and Lancaster Counties <br /> <br />HALLAM <br /> <br />~ <br />o <br />~ <br />"0 <br />1).& <br /><"1' <br /> <br /> <br />~ <br /> <br />SPONSORS: Gage County and Lancaster Soi I and Water Conservation Ofstrfcts and Cfatonia Creek <br />Watershed Conservancy District <br /> <br />FEATURES: Eight Floodwater Retarding Structures <br /> <br />CONSTRUCTION PERIOD: 4 Years <br />AVERAGE ANNUAL COST: $22,410 <br />BENEFIT-COST RATIO: 1.4 to 1.00 <br />PROJ ECT LI FE : 50 Years <br />ANNUAL O.M.&R.: $1,640 <br />COSTS BASED ON: 1965 Prices <br />COST OF RIGHT-OF-WAY: $85,100 <br /> <br />Table I - Protect Benefits Costs and Reoavment Bv Source <br /> Purpose Flood Control <br />Total Project Cost $ 696,000 <br /> Federal 450,000 <br /> Non-Fadera I 246,000 <br />Average Annual Project Benefits $ 31,870 <br /> <br />CLATONIA CREEK WATERSHED <br />i SOIL CONSERVATION SERVICE <br /> <br />LEGEND <br />PR010SED RESERVOIRS J <br /> <br />miles <br /> <br />" <br />, <br /> <br />3 <br />, <br /> <br /> <br /> Storage Capacity (Acre-Feet) <br />Number of Structures Total Ora I nage Area <br /> Above Structures Initial Sediment Flood Control <br /> R 1?,O~2 <Jeres 4,~70 I, IR~ ~,I R~ <br />-- ---- - --- ----. -~- - -------------- -- -----" -------- , --- __ _ ___ ____L______ --- ----- <br /> <br />Table 2 - Reservoir Data <br /> <br />o <br />, <br /> <br />. <br /> <br />. <br /> <br />1 - ~ <br />