My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03108
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:42 PM
Creation date
10/11/2006 11:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.J
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
2/1/1965
Title
Yellow Jacket Project Colorado: Plan Formulation Studies
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />; <br /> <br />r- <br />c.o <br />..... <br />CJ <br /> <br />.,i', <br />,- -'-~ <br /> <br />SUMMARY SHEET <br /> <br />YELLOW JACKET l'ROJECT. COLORADO <br /> <br />December 1964 <br /> <br />Units 1. 2. 3. 4, and 6 and Rio Blanco Reservoir <br />(Juniper Studies) <br /> <br />LOCATION: (See display map) <br /> <br />~: This plan only adds Rio Blanco Reservoir and the South Fork <br />Canal to increase the municipal and industrial water yield <br />from 55.000 acre-feet to 105.400 acre-feet annually. See <br />previous units for costs. features. and water supply data. <br /> <br />FEATURE AND COST: <br /> <br />Rio Blanco Dam and Reservoir <br /> <br />..... ... ......... .... <br /> <br />South Fork Canal................................. <br />Previous costs units 1. 2. 3, 4. and 6 ........... <br />Total......................................... <br /> <br />BENEFIT-COST ANALYSIS: <br /> <br />$ 8.179.000 <br />3,680,000 <br />73.721.000 <br />$85,580.000 <br /> <br />Average annual <br /> <br />Average <br />annual benefits <br />Primary $4.737.600 <br />Secondary 1.697.200 <br />Total $6,394.800 <br /> <br />equivalent <br />Project investment <br />OM&H. <br />CRSP cost <br />Total <br /> <br />~IT-COST RATIO~: <br /> <br />Direct <br />Total <br /> <br />1.29 <br />1.74 <br /> <br />(+$1.055.400) <br />(+$2.712.600) <br /> <br />costs <br />$2.952.000 <br />427.000 <br />303.200 <br />$3,682.200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.