Laserfiche WebLink
<br />co <br />co <br />...04 <br />, c.j <br /> <br />~ ' " J <br /> <br />December 1964 <br /> <br />SUMMARY SHEET <br /> <br />YELLOW JACKET PROJECT. COLORADO <br /> <br />Units 1, 2. 3. 4. and 6 (Juniper Studies) <br /> <br />LOCATION: (See display map) <br /> <br />~: The plan would include all the features and purposes of units <br />1, 2. 3. and 4. with the addition of Ripple Creek Reservoir <br />to obtain an increase in municipal and industrial water yield. <br /> <br />See units 1, 2. 3. and 4 and 1. 2. and 6. separately for costs. <br />features. sizes. and water supply. <br /> <br />BENEFIT-COST ANALYSIS: <br /> <br />Average <br />annual benefits <br />Primary $3.990.600 <br />Secondary 1.697.200 <br />Total $5,687,800 <br /> <br />BENEFIT-COST RATIOS: <br /> <br />Direct <br />Total <br /> <br />1.25 <br />1.79 <br /> <br />Average annual <br />equivalent costs <br />Project investment <br />OM&R <br />Share CRSP costs <br /> <br />(+$809.800) <br />(+$2,507,000) <br /> <br />$2.508.100 <br />405.500 <br />267.200 <br />$3.180.800 <br />