My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03108
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:42 PM
Creation date
10/11/2006 11:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.J
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
2/1/1965
Title
Yellow Jacket Project Colorado: Plan Formulation Studies
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ . <br />. >. <br /> <br />~ <br />lJ') <br />..<4 <br />N <br /> <br />'. "~:! <br /> <br />Units 1 and 2 (Juniper Studies) (Continued) <br /> <br />Josephine Basin <br /> <br />Initial capacity........................... <br /> <br />Length ..................................... <br />Coal Creek <br /> <br />Initial capacity........................... <br /> <br />Length ..................................... <br />Lost Park Collection <br /> <br />Initial capacity........................... <br /> <br />HATER SUPPLY: <br /> <br />Diversion requirement (per irrigable acre) ....... <br />Increased water supply for irrigation annually... <br />Increased water supply for M&I annually.......... <br />Annual stream depletion by project ............... <br />Minimum fish bypass at diversion Oct.-Mar. ....... <br />Minimum fish bypass at diversion Apr.-Sept. ...... <br /> <br />BENEFIT-COST ANALYSIS: (lOO-year period ac 3 percent) <br /> <br />tf:)P <br /> <br />300 CFS <br />39.5 mi. <br /> <br />175 CFS <br />18.5 mi. <br /> <br />100 CFS <br /> <br />3.50 A.F. <br />68,900 A.F. <br />30,000 A. F. <br />44.500 A'~lJ <br />30 CF:;.:I <br />70 CFslI <br /> <br />Average <br />annual benefi ts <br />Primary (direct) $1.127.400 <br />Secondary 611.400 <br />Total $1,738,700 <br /> <br />Average annual <br />equivalent costs <br />investment $721,000 <br />78.400 <br />89.000 <br />$888,400 <br /> <br />Project <br />OM&R <br />CRSP costs <br />Total <br /> <br />BENEFIT-COST RATIOS: <br /> <br />1.27 (direct benefits) <br />1.96 (total benefits) <br /> <br />NET ANlfUAL BENEFITS: <br /> <br />Direct <br />Total <br /> <br />+$239.000 <br />+$850,300 <br /> <br />"':.:,\ <br /> <br />".:"~, <br /> <br />lIThese minimum fish bypasses would occur only two or three <br />times each year. The remainder of the year the flows would be <br />greater than these minimums. <br />
The URL can be used to link to this page
Your browser does not support the video tag.