My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03108
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:42 PM
Creation date
10/11/2006 11:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.J
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
2/1/1965
Title
Yellow Jacket Project Colorado: Plan Formulation Studies
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. . <br /> <br />l~ <br />Lr:l <br />-.. <br />C.J <br /> <br />SUNMARY SHEET <br /> <br />YELLOW JACKET PROJECT, COLORADO <br /> <br />Units 1 and 2 (Juniper Studies) <br /> <br />December 1964 <br /> <br />LOCATION: Along the White River Basin in the vicinity of Meeker. <br />Co lor ado. <br /> <br />~: The multi-purpose first and second unit development would pro- <br />vide storage for recreation, fishery. municipal and industrial <br />water, and the irrigation of 23.226 acres. including 4.964 <br />acres of supplemental service land and 18,262 acres of full <br />service land. The principal features are: Lost Park Reservoir <br />located on a tributary of the North Fork of the White River; <br />Yellow Jacket Canal which diverts from the North Fork of the <br />White River and terminates at the beginning of the Coal Creek <br />Canal; Josephine Basin Canal. diverting from the Yellow Jacket <br />Canal and serving the project lands in Little Beaver. Flag <br />Creek. and Josephine Basin areas (during off-peak periods the <br />Josephine Basin Canal would deliver municipal and industrial <br />water at its terminus to private conveyance facilities). <br /> <br />COSTS: Construction costa (costs are reconnaissance and subject to <br />change) <br /> <br />Reservoirs <br />Lost Park <br />Canals <br /> <br />.......... .... ........ ................ <br /> <br />Yellow Jacket .................................. <br />Josephine Basin ................................ <br />Coal Creek ..................................... <br />Lost Park Collection ........................... <br />Laterals and drains .............. .,e............ <br />Total....................................... <br /> <br />PROJECT FEATURES: (Tentative, subject to change) <br /> <br />Lost Park Dam and Reservoir <br /> <br />Capacity...................................... <br />Surface area .................................. <br />Height of dam above streambed ................. <br />Canals <br />Yellow Jacket <br />Initial capacity........................... <br />Length ..................................... <br /> <br />$ 2,627,000 <br /> <br />1..800.000 <br />6.720.000 <br />2.736,000 <br />964.000 <br />3.646.000 <br />$21,493.000 <br /> <br />22,500 A.F. <br />555 A. <br />110 ft. <br /> <br />500 CBS <br />15 mi. <br />
The URL can be used to link to this page
Your browser does not support the video tag.