Laserfiche WebLink
<br />, <br />..... .~ <br /> <br />..... <br />LI") <br />...oj <br />".J <br /> <br />SUMMARY SHEET <br /> <br />Yellow Jacket Project, Colorado <br /> <br />Units I, 2.,3, (original studies) <br /> <br />December 1964 <br /> <br />LOCATION: Along the White and Yampa River Basins in northwest, Colorado. <br /> <br />~: The multi-purpose project would be extended by the addition of <br />Sweetbriar Reservoir to increased the municipal and industrial <br />water supply, while maintaining the project acreage as under <br />the recommended plan, Units 1 and 2. Principal features added <br />in Unit 3 would be: Sweetbriar Reservoir, located on the South <br />Fork of the White River, and the White River Canal which would <br />divert from the South Fork of the White River and terminate at <br />its junction with the Josephine Basin Canal. <br /> <br />COSTS: Construction costs (Reconnaissance and subject to change) <br /> <br />Reservoirs <br />S't-leetbriar!/. ... ...... . .... . .. . ..... .. ... .. .... <br />Units land 2 reser~irs ...................... <br />Canals <br />White River ................................... <br />Units 1 and 2 canals .......................... <br />Laterals, Units 1 and 2 .......................... <br />Total...................................... <br /> <br />PROJECT FEATURES: (Tentative, subject to change) <br />Sweetbriar Dam and Reservoirll.. ,_ <br /> <br />Capaci ty ...................................... <br />Surface area .................................. <br />Height of dam above streambed ................. <br />Canals <br />White River <br /> <br />Initial capacity........................... <br /> <br />Length ..................................... <br />Other Features (See Summary Sheet Units 1 and 2) .. <br /> <br />$ 1,800,000 <br />.11,248,000 <br /> <br />3,680,000 <br />33,234,000 <br />8.118.000 <br />$58,080,000 <br /> <br />49,000 A.F. <br />1,000 A. <br />86 ft. <br /> <br />250 CFS <br />10 mi. <br /> <br />l/Rio Blanco Reservoir at 70,000 acre-feet could be substituted <br />for Sweetbriar Reservoir to obtain the same M&I water yield resulting <br />benefit-cost ratios of: <br /> <br />1.07:1 Direct Benefits (+$194,000 net benefits) <br />1.62:1 Ibtal Benefits (+$1,637,000 net benefits) <br />