Laserfiche WebLink
<br />. '" <br />- <br /> <br />o <br />1.0 <br />.-.4 <br />C',J <br /> <br />Units 1 and 2 (original studies) (Continued) <br /> <br />BENEFIT-COST ANALYSIS: (lOO-~ear period at 3 percent) <br /> <br />Average <br />annual benefi ts <br />Primary ~l,785,OOO <br />Secondary 1,443.000 <br />Total ~3,228,OOO <br /> <br />BENEFIT-COST RATIOS: <br /> <br />Direct <br />Total <br /> <br />0.84:1 <br />1.52:1 <br /> <br />Average annual <br />equivalent costs <br />investment ~1,789,500 <br />158,000 <br />170.800 <br />~2,1l9,OOO <br /> <br />Project <br />, <br />OM&R <br />Share of CRSP coats <br />To tal <br /> <br />(-$334,000) <br />(+$1,109,500) <br />