Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />CJ <br />~ <br />C~ <br />C""'i <br />(... <br /> <br />Plan 6 was derived during the CAWCS as an alternative to Orme Dam, <br />an originally authorized CAP feature. The plan would provide regulatory <br />storage for CAP water, flood control for the Phoenix area, and dam safety <br />solutions for existing structures on the Salt and Verde Rivers. <br /> <br />~ <br /> <br />Cliff Dam would provide flood control, additional water conservation, <br />recreation, and dam safety. Other Plan 6 features include New Waddell <br />Dam on the Agua Fria River, and Modified Roosevelt and Stewart Mountain <br />Dams on the Salt River. <br /> <br />-30- <br />