<br />MWSI Project <br />Phase II Conjunctive Use Summary Report - DRAFT <br /> <br />August 22, 1995 <br /> <br />Table 11: Southern Plan-Cost Summary <br /> <br />ITEM QUANTITY UNIT COST TOTAL COST <br />RAW WATER PIPELINE 14 miles $750,000 $10,500,000 <br />WELLFIELD/COLLECTION 110,000 ac-ft $1,671 $183,810,000 <br />GROUNDWATER RlGHTS 60,000 ac-ft $1,000 $60,000,000 <br />COLLECTION MAIN PIPELINES 42 miles $500,000 $21,000,000 <br />PEAKING RESERVOIR 12,000 ac-ft $1,500 $18,000,000 <br />RECHARGE INFRASTRUCllJRE 275 wells $50,000 $13,750,000 <br />CONTINGENCY (20 percent) $61,410,000 <br />SUBTOTAL $368,472,000 <br />CONJUNCTIVE USE RAW WATER COST PER AF $6,141 <br />SURFACE WATER CHARG E ("SWC) COST PER AF $2,500 <br />TOTAL RAW WATER COST PER AF $8,641 <br />TREATMENT 180 mgd $500,000 $90,000,000 <br />DISTRIBUTION SYSTEM 50 miles $1,000,000 $50,000,000 <br />CONTINGENCY (20 percent) , $28,000,000 <br />SUBTOT AL $168,000,000 <br />TOTAL PROJECT COST $536,472,000 <br />TOTAL TREA TED WATER COST PER AF $11,441 <br /> <br />Table 12: Southern Plan-Existing Investment <br /> <br />ITEM QUANTITY UNIT COST TOTAL COST <br />RA W WATER PIPELINE o miles $750,000 $0 <br />WELLFIELD/COLLECTION 72,000 ac-ft $1,114 $80,208,000 <br />GROUNDWATER RlGHTS 60,000 ac-ft $1,000 $60,000,000 <br />COLLECTION MAIN PIPELINES o miles $500,000 $0 <br />PEAKING RESERVOIR o ac-ft $1,500 $0 <br />RECHARGE INFRASTRUCTURE 2 wells $33,500 $67,000 <br />CONTINGENCY (20 percent) $28,055,000 <br />SUBTOTAL $168,330,000 <br />INVESTMENT PER EXISTING AF $8,087 <br />TREATMENT 10 mgd $333,333 $3,333,000 <br />DISTRlBUTION SYSTEM o miles $1,000,000 $0 <br />CONTINGENCY (20 percent) $667,000 <br />SUBTOTAL $4,000,000 <br />TOTAL PROJECT COST $173,973,000 <br />INVESTMENT PER EXISTING AF $8,270 <br /> <br />This amount of infrastructure investment contributed to this project would allow existing <br />groundwater taps to effectively buy into the conjunctive use plan without major tap assessments <br /> <br />43 <br />