Laserfiche WebLink
<br />MWSI Project August 22, 1995 <br />Phase II Conjunctive Use Summary Report - DRAFT <br />relationship between water temperature, viscosity and specific capacity are contained in six <br />quarterly reports for the period March, 1992 to September, 1994. The following table <br />summarizes the injection runs which have taken place at Well A-6A: <br /> Injection Runs at Well A-6A <br />Run Injection Head Buildup Head Buildup Length Volume Volume Cumulative <br /> Rate A-6A M-I of Run Injected Pumped Net Stored <br /> (gpm) (feet) Wll ~ Wl W) Uill <br />IR-I 445 164 34 7 13,8 0.5 13,3 <br />IR-2 444 212 37 14 27.6 0.7 40.2 <br />IR-3 441 180 7 13.7 0,6 53.3 <br />IR-4 442 172 7 13,7 0.7 66.3 <br />IR-5 44] 162 28 21 41 0.5 106,8 <br />]R-6 608 314 40 7 ]9.3 0,9 125.2 <br />IR-7 596 307 47 7 18,5 0.8 142,9 <br />IR-8 583 365 49 14 36.1 0,8 178,2 <br />IR-9 547 431 44 21 50.8 0.5 228.5 <br />IR-IO 526 399 45 21 48.7 0.5 276,7 <br />IR-II 526 410 43 30 69,9 0,5 345,8 <br />IR-12 534 438 43 42 98.3 0,7 443,6 <br />IR-13 607 359 69 8 20.9 0,7 463,6 <br />IR-14 702 365 52 7 2\.6 0,6 484,7 <br />IR-15 707 354 47 7 22.1 0,9 505.9 <br />IR-16 700 358 52 7 21.7 0,5 527 <br />IR-17 704 349 41 ]4 43.8 0.5 570,3 <br />IR-18 723 348 19 14 44.7 0,5 614,5 <br />IR-19 949 7 29.3 0,5 643.6 <br />IR-20 931 7 28.4 0.5 671.5 <br />IR-21 891 497 81 8 3\.8 0,5 702.7 <br />IR-22 866 518 68 7 26.6 0.5 728.8 <br />IR-23 825 545 61 7 25.5 0,5 753,8 ' <br />IR-24 827 541 65 7 24,8 0,9 778.6 <br />IR-25 799 545 67 14 47.7 0.9 826.2 <br />IR-26 789 542 65 14 48 0.9 874,2 <br />IR-27 759 573 62 ]4 46 0,9 920,2 <br />IR-28 800 513 70 14 49,5 0,7 969 <br /> Injection runs IR-I to IR-7 were in 1992, IR-8lo ]R-12 were in 1993 and IR-13 to IR-23 <br />were in 1994 and IR-24 to IR-28 were in 1995, As the data shows, the injection rate has been <br />increased from its original level of approximately 440 gpm to an average high of 949 gpm, <br /> <br />--- 11 <br />