Laserfiche WebLink
<br />., <br />. <br /> <br />. <br /> <br />o <br />: -~) <br />...... <br />w <br />~ <br />Q <br /> <br />~ <br />if> <br />Z <br />"' <br />n. <br />x <br />"' <br /> <br />z <br />"' <br />;;; <br />z <br />a: <br /> <br />. <br /> <br />'J <br /> <br />~ <br /> <br /><I <br /> <br />co <br /> <br />uJ <br />" <br />::J <br />o <br />o <br />a: <br />n. <br />w <br />no <br /> <br />~ <br />. <br /> <br />PUBLIC LAW 566 WATERSHEDS <br /> <br />Preauthorization Study Phase <br /> <br />This phase has two parts which are divided by the filing of a formal application <br />for planning assistance through the A-95 process. Preapplication assistance <br />consists of gathering enough information to determine if an application will be <br />feasible. This step includes the beginning of an environmental evaluation. Post <br />application activities center around conducting a detailed environmental assess- <br />ment to identify problems and opportunities in the watershed. <br /> <br />As soon as substantive inquiries are received concerning a potential watershed <br />project, an environmental evaluation is initiated using an interdisciplinary team <br />approach. To the extent possible, existing data is used to provide information <br />about the watershed. In most instances, studies conducted before receiving a <br />formal application will not include detailed field work; however, enough work <br />will be done to ascertain that an application is feasible. Project potential <br />must be evaluated objectively based on the expected environmental impacts of <br />various alternatives. <br /> <br />A valid application must have adequate sponsorship by qualified local organi- <br />zations, conform with federal policies' on nondiscrimination, comply with the <br />acreage limitation under the Act, include documentation that appropriate clear- <br />inghouse procedures have been followed, and be approved by the state. <br /> <br />Prior to starting post application studies, a plan of work is prepared that <br />becomes the management tool to govern federal actions in planning the watershed. <br />The plan of work will show the scope, planning detail, public participation, <br />estimated cost, and schedule for completing the preauthorization planning report. <br />Estimates of time and funds for the study are shown in detail and will provide a <br />basis for monitoring planning funds. <br /> <br />The post application planning study must be done pursuant to a plan of work <br />prepared by the State Conservationist. This post application study is done to <br />complete the environmental assessment by identifying land and water re~ource <br />problems and opportunities of the watershed. The sponsors' desires must be <br />determined; resource capabilities evaluated; alternative solutions formulated; <br />and the environmental, social, and monetary impacts of the solutions assessed. <br />Studies are carried to the extent and detail necessary to determine whether an <br />economic and an environmentally acceptable watershed plan can be developed that <br />the local sponsors are willing and able to carry out. <br /> <br />The preauthorization planning report summarizes the results of planning studies <br />to date. The report may be in one of two forms: one summarizing planning if it <br />appears likely that PL-566 financial assistance can be provided and one covering <br />those cases where it appears unlikely that PL-566 assistance can be provided. <br /> <br />v <br />