Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />w <br />(f1 <br />z <br />W <br />0- <br />X <br /> <br />.w <br /> <br />z <br />w <br />L <br />z <br />0: <br /> <br />. <br /> <br />-5 <br /> <br />r <br /> <br />~ <br /> <br />;:, <br /> <br />w <br />'-' <br />::l <br />o <br />o <br />0: <br />0- <br />W <br />0: <br /> <br />. <br /> <br />Corps of Engineers <br />Revised July 1984 <br /> <br />o <br />':::;J <br />.... <br />W <br />(J1 <br />CJl <br /> <br />ARKANSAS RIVER BASIN ABOVE KEYSTONE DAM <br /> <br />103, Arkansas River and Tributaries above John Martin Dam. CO, - <br />Portland Local Protection Project, CO <br />STATUS: Project authorized for Phase I stage of dvance Engineering and Design <br />by the Water Resources Development Act of 1974. This project has been addressed <br />as part of the Arkansas River and Tributaries above John Martin Dam, CO project. <br />Phase I studies for the Portland Local Protection project were initiated in FY 83; <br />no feasible alternative has been formulated. <br /> <br />DESCRIPTION: Phase I GDM studies for Arkansas River and Tributaries above John <br />Martin Dam, CO, with emphasis on Portland, CO. Survey report dated 24 June 1968 <br />recommended 3,600 feet of intermittent levees and floodwalls along the right bank <br />of the Arkansas River and 3,250 feet of channel improvements since the survey re... <br />port was completed, extensive relocations of property have occurred in the flood <br />plain, reducing project benefits. An economically feasible solution is not <br />apparent at this time. <br /> <br />104, Arkansas River and Tributaries above John Martin Dam, CO, - <br />Brewster-Florence Floodway <br />STATUS: Project authorized for Phase I stage of Advance Engineering and <br />Design by the Water Resources Development Act of 1974. The project was <br />addressed as part of the Arkansas River and Tributaries above John Martin Dam, <br />CO project. Phase I studies for the Brewster-Florence Floodway were combined with <br />the Florence Local Protection Project. Work on the Phase I GDM was terminated in <br />FY 82. No economically feasible plan was formulated. <br /> <br />DESCRIPTION: Phase I GDM studies were prepared for Arkansas River and Tribu- <br />taries above John Martin Dam, CO, with emphasis on Florence, CO. Survey report <br />dated 24 June 1968 recommended improvements on the Arkansas River from Brewster <br />to Florence. The improvements consisted of a south bank levee about 31,280 feet <br /> <br />long beginning about 3.5 miles above Florence, CO, and terminating 2.5 miles <br />downstream at the mouth of the Cocklebur Creek. The levee was designed to <br />provide laO-year protection. No structural nor nonstructural measures investigated <br />were economically justified. <br /> <br />SPONSOR: City of Florence, CO, and Fremont.County, CO. <br /> <br />13 <br /> <br />I <br />.cJ <br />