Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />~ <br />Vi <br />Z <br />"' <br />Q. <br />X <br />W <br /> <br />z <br />w <br />:;: <br />z <br />n: <br /> <br />.. <br />" <br />v <br /> <br />~ <br /> <br />" <br /> <br />CO <br />w <br />V <br />::J <br />o <br />o <br />n: <br />Q. <br />w <br />n: <br /> <br />. <br /> <br />o <br />o <br />.... <br />w <br />W <br />~"1 <br /> <br />CONSTRUCTED PROJECTS AND PLANNING ACTIVITIES <br />OF <br />THE BUREAU OF RECLAMATION, THE CORPS OF ENGINEERS, <br />THE SOIL CONSERVATION SERVICE AND THE STATES <br /> <br />FOREWORD <br /> <br />The attached report has been compiled by the Standing Committee on <br />Exchange of Program Information to assist the AWRBIAC in reviewing the <br />planning acti vi ties of the three construction agencies and the states. <br />The planning activities are presented on a watershed basis, using the <br />original AWR Basin segment breakdown: <br /> <br />Arkansas River Basin above Keystone Dam <br /> <br />Cimarron and Canadian River Basins <br /> <br />Arkansas River Basin below Keystone Dam <br /> <br />White River Basin <br /> <br />Red River Basin above Denison Dam <br /> <br />Red River Basin below Denison Dam <br /> <br />In each of these basin segments, information is arranged in the following <br />order: (1) Bureau of Reclamation (BR), (2) Corps of Engineers (CE), (3) <br />Soil Conservation Service (SCS), (4) States (TX, LA, etc.), and Other (NF). <br /> <br />The series of maps of individual AWR segments relate directly to the <br />narrative section of the report and show Basin/Project Studies and con- <br />structed projects. Projects are shown in contrasting colors for each <br />construction agency activity. <br /> <br />The Standing Committee believes that this effort represents a true pro- <br />gram of information exchange. The Committee has not attempted tc evaluate <br />the effect of one program on another. Each agency has a responsibility <br />to develop its own program. This consolidated report is designed to <br />assist each agency, each member of the AWRBIAC Committee, and others with <br />interests in the sub-basins, to better comprehend the interrelated plan- <br />ning activities and to recognize areas where further coordination is <br />desirable. The report is designed in 3-ring binder form to minimize the <br />expense of periodic updating. It will be reviewed annually by the <br />Standing Committee and only those pages containing updated data will be <br />distributed for insertion into the report. It is the current view of the <br />Standing Committee that the entire report will be reprinted and distribut- <br />ed every 3-5 years. <br /> <br />Rev Jun 85 <br />