My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02985
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP02985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:02 PM
Creation date
10/11/2006 11:28:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC
Basin
Arkansas
Water Division
2
Date
3/1/1982
Title
Arkansas-White-Red Basins Water Resources Activities Report --- Part 1 of 2 -- Cover Page - Page 141
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~ <br />if> <br />Z <br />W <br />!l. <br />X <br />"' <br /> <br />z <br />w <br />;;: <br />Z <br /> <br />Q: <br /> <br />. <br /> <br />" <br /> <br />~ <br /> <br /><l <br /> <br />:: <br /> <br />OJ <br />" <br />:::> <br />o <br />o <br />Q: <br />n. <br />w <br />'" <br /> <br />.. <br /> <br /><:':) <br />(7) <br />,... <br />w <br />ol::a <br />w <br /> <br />Corps of Engineers <br />Revised July 1984 <br /> <br />ARKANSAS RIVER BASIN ABOVE KEYSTONE DAM <br /> <br />31, Cow Creek Channel Improvement, KS <br />STATUS: Authori zed by the Flood Control Act of 1962. <br />been requested. <br /> <br />Deferred status has <br /> <br />DESCRIPTION: Tulsa District recommended a 26-mile channel improvement and 2 <br />dikes to control flooding of farmland between Lycns and Hutchinson, KS. <br /> <br />SPONSOR: Grant Township Drainage District <br /> <br />33, Shidler Lake, OK <br />STATUS: Authorized for construction by the Flood Control Act of 1965. <br />Preconstruction planning is complete. Estimated Federal cost is $34,600,000. <br />It is awaiting congressional funding for construction. <br /> <br />DESCRIPTION: (TD) Project purposes are flood control, water supply, recrea- <br />tion, and low flow augmentation. Project is on Salt Creek, a tributary to <br />the Arkansas River. <br /> <br />SPONSOR: NI A <br /> <br />34a, El Dorado Lake, KS <br />STATUS: Authorized by the Flood Control Act of <br />October 1983 and impoundment began June 1981. <br />is scheduled for FY82. Estimated Federal cost of <br /> <br />1965. Construction began in <br />Public use area construction <br />the project is $90,300,000. <br /> <br />DESCRIPTION: (TD) El Dorado Lake will be operated as a unit of a three-lake <br />system for flood control in the Walnut River Basin. It will provide 79,200 <br />ac-ft for flood control storage and 154,100 ac-ft for conservation. <br /> <br />SPONSOR: City of El Dorado, KS (water supply), Kansas State Park and <br />Resources Authority (recreation). <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.