Laserfiche WebLink
<br />Willow Creek Reservoir <br /> <br />During early October the Willow Creek pwnps will be operated to transfer about +;lOO acre- <br />feet of water to Lake Granby. In late November, Willow Creek Reservoir will be pwnped <br />down to ~ acre-feet to allow for storage of winter inflows and the pwnping plant will be <br />winterized and taken out of service until MMen J 1. During October through January, river <br />releases are expected to average f ft3/s to bring Willow Creek Reservoir storage to &;eeG <br />acre-feet by the end of January. <br /> <br />Lake Granbv-East Slope Terminal Stora~e <br /> <br />Storage in Lake Granby of 499,619 acre-feet at the beginning of the water year was Hi- <br />percent of the 1966-1995 average. Terminal storage on the east slope was ~ percent of <br />normal. <br /> <br />About 83,299 acre-feet of water will be diverted to the east slope during the October-January <br />period. This amount would be 99- percent of the average. ,'d16f thi3 Iii. c;rJi6n c;xeC:fJt fur 199 <br />aere; :&.;:t ~1i1l be ptlfl11'ea 16 Shaelo n ~Iotlfttttit... R't:3Cf'\. 6ir Ham Lake; Cranb). A total of <br />55,200 acre-feet of water will be pwnped to Carter Lake and 18,999 acre-feet will be <br />delivered to Horsetooth Reservoir from October through January. By the end of January, <br />Carter Lake storage will be about 93,299 acre-feet and Horsetooth Reservoir will <br />approximate 127,799 acre-feet. <br /> <br />filenlllllC: CBTA0P98.DFf <br /> <br />20 <br /> <br />P",liminary Woridng Dnlft July 8.1_ <br />