My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02861
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:19 PM
Creation date
10/11/2006 11:24:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1982
Author
DoI, BoR
Title
Narrows Unit Colorado No.2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />were also briefed concerning .Narrows Unit <br />flood control benefits and storage capacity. <br /> <br />Reclamation and conservancy district represen- <br />tatives met with a large number of civic groups <br />and local government entities concerning the <br />status of the project and activities scheduled to <br />ready the project for construction. <br /> <br />Review of dam design and updating of project <br />costs and benefits are also underway and results <br />are scheduled to be available early in 1983. <br /> <br />The U.S. Fish and Wildlife Service recently issued <br />a biological opinion concerning effect of the <br />Narrows Unit on three endangered species. The <br />opinion stated that construction of the project is <br />not likely to jeopardize the continued existence of <br />the peregrine falcon and the black footed ferret. In <br /> <br />MAXIMUM WATER S RFACE EL.4433.3 <br /> <br />-~, <br /> <br />addition, the.oject would not likely jeopardize <br />the existence of the bald eagle if several "conserva- <br />tion measures" are-implemented. An additional <br />opinion concerning the effect of the Narrows Unit <br />on the whooping crane is expected in the near <br />future. <br /> <br />Tentative schedule for future activity concerning <br />the Narrows Unit is as follows: <br />- Completion of the feasibility design and cost <br />estimate of the dam, winter 1982 <br />- Determination of municipal and industrial <br />water needs, winter 1982 <br />- Negotiation and execution of a cooperative <br />agreement between Reclamation and the <br />Colorado Division of Wildlife and Division of <br />Parks and Outdoor Recreation, 1983 through <br />spring 1984 <br /> <br />'" <br /> <br />t <br /> <br />U"''TO.T....'" <br />D~PART..€NTOfTH{"'TfRIOOO <br />IUU..1I0PR'Cl......11OH <br />LOWER M1SSClURI ItEllION <br />PICK.S!.O.l.HfllISSOURIUSIHPIlOM.... <br />SOUTH PLATTE DIVISION <br /> <br />NARROWS DAM a RESERVOIR <br /> <br />~ I ~.. ':.:;';:-.. _ _..,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.