My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02837
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:44:57 PM
Creation date
10/11/2006 11:23:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8046
Description
Section D General Studies - DSS
State
CO
Water Division
1
Date
2/19/1997
Author
CWCB
Title
Colorado Decision Support System - 1997-2001 - Exhibit A - Scope of Work for Water Right Administrative Tools - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />GO itlt) 3 <br /> <br />19.2 Final Documentation Revise on-line help screens to include State comments. <br />Deliverables: <br />RTiwill: <br /> <br />I. Operational Diversion Record Transfer GUL <br />2. On-line help that documents how to navigate the GUI(s) with examples. <br /> <br />Task 20 - Finalllsers Manual <br /> <br />RcspOJ1sibilirv: RTi <br /> <br />OhjcClil'c: Update the document prepared in Task 14, Preliminal)' Users Manual, to <br />include activities perfomled through Task 19, Diversion Record Transfer. <br /> <br />Approach: <br /> <br />20. I. Draft Users Manual Revise the Final Preliminary Users Manual developed in <br />Task 14 to include activities performed through Task 19, Divcrsion Record <br />Transfer. Provide three (3) paper copies to the State. <br /> <br />20.2. Final Users Manual Review and incorporate State comments into a Final Users <br />Manual. Provide three (3) paper copies and one digital copy in Microsoft Word. <br /> <br />20.3. HTML Users Manual Convert and incorporate the Final Users Manual to HTML <br />for on-line access. <br /> <br />Dcli,'erables: <br /> <br />I. Draft Water Rights Administration Tool Users Manual. <br />7 Final \Vater Rights Administration Tool Users Manual. <br />3. On-line Water Rights Administration Tool Users Manual. <br /> <br />Task 21 - Water Right Administration Tool Implementation Phase II <br /> <br />Responsibiliry: Boylc <br /> <br />Objective Present and Implement the Water Administration Tool functionality developed <br />through Task 20, Final Users Manual to the western slope (Divisions 4, 5, 6 and 7). <br /> <br />Cummel1l This task assumes the water administration tool is fully operational and error <br />free. Also. it assumes a final Users Manual has been prepared in Task 20. <br /> <br />Approach: <br /> <br />21. I. Test Evaluate up to two (2) versions of the enhanced Water Administration Tool. <br />Review the Final Users Manual. Prepare 2-4 page memo per version describing the <br />Administration Tools ability to meet the objectives of the scope and division <br />personnel. <br /> <br />c :Iwlcrdsslscopelph III blscope.doc <br /> <br />2/19/97 - 6] <br />
The URL can be used to link to this page
Your browser does not support the video tag.