My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02837
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:44:57 PM
Creation date
10/11/2006 11:23:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8046
Description
Section D General Studies - DSS
State
CO
Water Division
1
Date
2/19/1997
Author
CWCB
Title
Colorado Decision Support System - 1997-2001 - Exhibit A - Scope of Work for Water Right Administrative Tools - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />U lill ;) ~14 <br /> <br />Approach: <br /> <br />IS.!. Division Contact Once a month, contact each western slope division otllce to <br />discuss progress, upcoming data needs, potential special project worksheets and basin <br />administration issues which might influence the design and implementation of the <br />Water Administration Tool. Visit each division office in person once every 3 months. <br />Prepare] -2 page memo per basin per month describing contact and results. <br /> <br />15.2. Testing Test up to three versions of the Water Administration Tool as it is <br />developed up to Task 13, Prcliminar:v Users Manual. Review the Draft and Final <br />Preliminary Users Manual(s). Prepare 2-4 page memo per model version describing <br />the Administration Tools ability to meet the objectives of the SCOpe and division <br />personnel. <br /> <br />15.3. District Mailing At least two weeks prior to thc District WaleI' Information <br />Worksheet meeting described below, prepare and mail a letter describing the meeting <br />agenda and objectives. Include the draft user manual developed in Task 14, and a list <br />of information to be brought to the meeting (key structures, river mile location of <br />each, regional lag/loss data, computer (?), etc.). <br /> <br />15.4. District Implementation Conduct a District Water Information Worksheet <br />meeting for each water commissioner in the western slope (4, 5. 6 and 7). For <br />budgeting purposes, assume two CRDSS management representatives will be on-site <br />at each meeting to assist and that the implementation will require one 8 hour meeting <br />at each western slope Division office (total of four 8 hour meetings). Also, as <br />described and budgeted in Task 29, RTi Management, assume one software <br />developer will be on site at the first meeting. Present the Water Administration Tool <br />and its operation on a sample water district. Work with individual commissioners to <br />implement a Water Information Sheet in each district and resolve questions. Prepare <br />a memorandum containing approximately 4 pages of text that describes software <br />performance, revisions to Users Manual, software revisions, and meeting attendees. <br /> <br />15.5. District Follow Up Within the budgeted amount for this Subtask, follow up the <br />District Water Information Worksheet implementation meeting by phone to resolve <br />outstanding issues. <br /> <br />15.6. Division Mailing At least two weeks prior to the division and special project <br />worksheet meeting described below, prepare and mail a letter describing the meeting <br />agenda, and objectives. Include a list of information to be brought to the meeting <br />(key division wide structures for division wide administration, special project data, <br />etc. <br /> <br />15.7. Division and Special Project Implementation Conduct a Division Information <br />and Special Proiect Worksheet meeting for each division in the western slope (4, 5, 6 <br />and 7). For budgeting purposes, assume two CRDSS management representatives <br />will be on-site at each meeting to assist and that the implementation will require one 8 <br />hour meeting at each westem slope Division office (total of four 8 hour meetings). <br />Also, as described and budgeted in Task 29, RTi Management, assume one software <br />developer will be on site at the first meeting. Present a special project worksheet <br /> <br />c :Iwlcrd sslscopelph 1 I t b\scope. doc <br /> <br />2/19/97 - 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.