My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02837
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:44:57 PM
Creation date
10/11/2006 11:23:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8046
Description
Section D General Studies - DSS
State
CO
Water Division
1
Date
2/19/1997
Author
CWCB
Title
Colorado Decision Support System - 1997-2001 - Exhibit A - Scope of Work for Water Right Administrative Tools - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(jud~J3 <br /> <br />Objective: Prepare a Preliminary Users Manual that contains information required to use <br />the Water Rights Administration Tool developed through Task 13. <br /> <br />Comment Documentation is expected to be prepared at the same time an application is <br />developed. In particular, on-line help screens are included in the development of each <br />GUI. This task will allow the information prepared during development to be assembled <br />into a formal Water Right Administration Tool Users Manual, similar to that developed <br />in Phase II. <br /> <br />..Jpl'/"{)ach: <br /> <br />I.U. Dr:lft Outline Develop an draft 2-4 page outline and mcmo lor the Water Rigl1\s <br />Administration Tool Users Manual. The outline should include both major sections <br />and subsections. The memoranda should discuss how the proposed outline might <br />include information from the existing South Platte user manual, this scope or work <br />and the on-line help screens developed for each GUI. The memorandum should <br />discuss whether the Users Manual should be a separate product document or a part of <br />the existing Phase II CROSS Users Manual. <br /> <br />J 4.2. Final Outline Revise the outline and memorandum based on State comments. <br /> <br />14.3. Draft Preliminary Users Manual Develop a 30 - 40 page Draft Preliminary Water <br />Rights Administration Tool Users Manual that contains infomlation required to use <br />the Water Rights Administration Tool developed through Task 13. This manual will <br />contain descriptions that are exactly the same as the on-line help screens provided lor <br />each GUI developed. In addition, the manual will contain figures for each GUI <br />developed, similar to this scope of work. <br /> <br />14.4. Final Preliminary Users Manual Review and incorporate State comments into a <br />Final Preliminary Water Rights Administration Users Manual. Provide three (3) <br />paper copies and one digital copy in Microsoft Word. <br /> <br />Deliverables: <br /> <br />I. Draft outline and memorandum. <br /> <br />J Revised outline and memorandum. <br /> <br />3. Draft Preliminary Water Rights Administration Tool Users Manual. <br />4. Final Preliminary Water Rights Administration Tool Users Manual. <br /> <br />Task 15 - Water Right Administration Tool Implementation Phase I <br /> <br />Responsibility: Boyle <br /> <br />Objective: Present and Implement the Water Administration Tool developed through <br />Task 14, Preliminary Users Manual to the western slope (Divisions 4,5,6 and 7). <br /> <br />Comment Portions of this task assumes the water administration tool development Tasks <br />1-14 are complete, operational and error free. Also, it assumes a draft User Manual has <br />bcen prepared. <br /> <br />c: \wlcrdsslscopelph III blscope.doc <br /> <br />2119/97 - 5 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.