Laserfiche WebLink
<br />t..'i '; --1 <br /> <br />30 <br /> <br />METROPOLIT.....N W:\TER DISTRICT <br /> <br />The original cost of the water distribution system, the cost of <br />additions and betterments, and the net cost after credits as of <br />June 30, 1948 are shown in table 5_ <br />The estimated cost of the northerly half of the San Diego aque- <br />duct is also shown. This amount is to be paid in installments over a <br />period of 30 years without interest. <br /> <br />lu..ni) 5>.( <br />066,084.43 <br />53,275_73 <br />99,123,4 1 <br />$52,273,719.33 $1.185,430_2>1 <br />$5:l,45H,149./l2 <br /> <br />TABLE 5 <br /> <br />DISTRIBUTION SYSTEM FEATURE~ <br /> <br />June 30, 19.18 <br /> <br />FICAfURE <br /> <br />ORII~IN.~J. <br />CflST <br /> <br />Right of way, lands, and easemenl~ <br />Cajalco dam, dike, and head works... <br /> <br />Pipelines: <br />Precast concrete. <br />COllcrete cast-in-place . <br />A!'ibestos cement <br />Welded steel <br />Cast-iron <br />Tunnels "... <br />Reservoirs <br />Softening and filtration plant <br />Miscellaneous <br />Additional service connections.. <br /> <br />$ 2.618,040_20 <br />5,967.121.HH <br /> <br />1.15.77 mile~ <br />0.31 mile <br />2.44 mil~s <br />.... .....72.53 miles <br />...........10.13 miles <br />lli.47 mi]e~ <br /> <br />12,729,3>14,40 <br />381,507_24 <br />92,461.98 <br />11,725,142_89 <br />864,862.17 <br />G.705.984.28 <br />7.5Ul,4VU.~1 <br />3,439.122_84 <br />248,5fll.16 <br /> <br />Totals <br />Grand total <br /> <br />Ded uel: <br />Salvagoe sales. . <br />Additional service connections, <br />cost paid by memher cities.. <br />Total deductions om <br />Net cost to June 30, 1948.. <br /> <br />$14,991.63 <br /> <br />Annl1lO:"-S AND <br />BETTfRMF:STS <br /> <br />$ 28,538.05 <br />2,"83_0:1 <br /> <br />7,!l\Jfi.\JG <br /> <br />12.954_9~ <br />3,997.1:! <br /> <br />$99,423.41 <br />$114,415.04 <br />$53,344,734.58 <br /> <br />Add: <br />Estimated cost to District of northerly <br />half of San Dieg-o aqueduct <br /> <br />$6.500,000_00 <br /> <br />Operation of ~Mo},1'is retiervoi-r <br /> <br />Morris reservoir was operated during the entire year in accord- <br />~w~ wit.h thp contract entered into on October 1. 1945 between the <br />District, the San Gabriel Valley Protective Association, and the <br />Los Angeles County Flood Control District, Coincidentally, the <br />District entered into a contract with the United States. granting <br />