My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02818
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:03 PM
Creation date
10/11/2006 11:22:28 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Colorado Mainstem
Date
7/1/1948
Author
Metro Water District
Title
Metropolitan Water District of Southern California - Tenth Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~';S0 <br />G METROPOLITAN WATER DISTRICT <br /> <br />CHRONOLOGY OF THE <br />COLORADO RIVER AQUEDUCT <br /> <br />1923 Preliminary studies of Colorado River as a source of addi- <br />tional water supply were begun by City of Los Angeles. <br />1924 Colorado River Aqueduct Association organized at Pasadena, <br />California. <br />1925 City of Los Angeles issued $2,000,000 Colorado River project <br />bonds for preliminary surveys and investigations, <br />1927 Metropolitan Water District Act enacted by California Leg- <br />islature permitting noncontiguous cities and districts to <br />cooperate in acquisition of domestic water supplies. <br />1928 The Metropolitan Water District of Southern California <br />organized with eleven member cities. <br />1930 District took over all engineering and other work and records <br />from the Bureau of Water Works and Supply of the City of <br />Los Angeles and paid in full all preliminary expenses of <br />tbe city. <br />District contracted with the United States for storage of <br />water and for 36 per cent of the power generated at Hoover <br />Dam, <br />1931 Foul' cities joined the District and two withdrew_ <br />A construction bond issue of $220,000.000 was approved by <br />District electors on September 29. <br />1932 December_ First block of construction bonds sold to Re- <br />construction Finance Corporation_ Construction work was <br />started in the last week of the year_ <br />1941 First delivery of softened water made June 17 to Pasadena_ <br />Initial stage of Colorado River aqueduct cort<tl'uction com- <br />pleted July 31. Colorado River aqueduct changed from a <br />construction to an operation and maintenance basis August L <br />Availability of Colorado River water for any demand guar- <br />anteed secllrity from water shortage to every constituent <br />area of the Metropolitan Water District. <br />Emergency guarding of aqueduct features instituted im- <br />mediately after Pearl Harbor. December 7. <br />1942 A suppl:, of water in the Colorado River aqueduct made <br />possible the training by the United States Army of great <br />numbers of soldiers and airmen in open desert regions of <br />Southern California_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.