Laserfiche WebLink
<br />.... ; <br /> <br />t _~, ~ ~L"'7 <br /> <br />. <br /> <br />I <br /> <br />. <br /> <br />,..), ", <br />I <br /> <br />'"."" <br /> <br />. " <br /> <br />- 4 - <br /> <br />C. 1Jhether said project will be i.n ecnoral accord <br /> <br />with the most beneficial utilization of the }Iater for <br /> <br />navigation, water power, irri~ation, or other beneficial <br /> <br />public uses, and for aiding flood control, reclamation, <br /> <br />..,' <br /> <br />and, similar developments. <br /> <br />D. , Whether proper provision is made for present or <br />futUre electrical,interconnection with other projects or <br /> <br />, systems in order to 'take advantage of diversity of stream- <br /> <br />flow and of power demands. <br />E. 'l:Jhether the use to which the ,p~wer will be de- <br /> <br />voted is, in general. in accord with the needs of the com- <br /> <br />lllUnity and of the public welfare. <br />F. Whether the applicant is financially able to carry <br />, , <br /> <br />out the development. <br /> <br />G. Whether the construction, maintenance, and opera- <br /> <br />tion of the proposed project works will interfere or be 1n- <br /> <br />consistent with the purpose for which any reservation of <br /> <br />lands of the United states was created or acquired. <br /> <br />Article 3. The priority granted under the permit will be lost if <br /> <br />the Permittee fails to fulfill the requirements of the permit, if the <br /> <br />permit is cancelled by order of the Commission, or if in course of con- <br /> <br />.sideration by the Conunission of'said application for license, the Per- <br /> <br /> <br />'mittee shall not on or before the date of, expiration of the permit, or <br /> <br />such later date as may be fixad by the Commission: <br /> <br />A. File data required by the COlMlission in addition to <br /> <br />that contained in or furnished with said application; or <br /> <br />,- , <br />