Laserfiche WebLink
<br />t . <br /> <br />" <br />, . . <br /> <br />.~~~~'~ <br />t.: .~ '., _ '. <br /> <br />. <br /> <br />. <br /> <br />, <br />/ <br /> <br />, <br />, <br /> <br />- 2 - <br /> <br />the District Engineer, of the Geological SUl~ey having ,charge <br /> <br />of strerun-gagine operation in the region of said project; <br /> <br />and the Permittee shall advance the said Geological Survey <br /> <br />the amount of funds estink~ted to be necessary for such co- <br /> <br />operation ~nd super\dsion for such periods as may be mutually <br /> <br />agreed upon. Tho Pormitt8e shall keep accurate and suffi- <br /> <br />cient record of the foregoing determinations to the satis- <br /> <br />faction of the Commission. shall make return of such records <br /> <br />at the time ot: filing application for license and, at such <br /> <br />other times as the' Commission may require, and in such form <br /> <br />as the Commission may prescribe. <br /> <br />B. Sink such test pits or make such borings or other <br /> <br />foundation explorations and m~e such geologic studies and <br /> <br />tests on foundations and fill material as will make avail- <br /> <br />able sufficient information relating to character of founda- <br /> <br />tions and materials for the projoct structures to permit of <br /> <br />the dosi[;nin[: oi' the structures in al::cordlln~e with Good en- <br /> <br />gineerinG practice and the checking of their safety, aciE<,uacy, <br /> <br />and desirability in tlill development of the resources involved. <br /> <br />C. Begin the required investigations within sixty days <br /> <br />after acceptance of the permit, and thereafter prosecute such <br /> <br /> <br />investigations in such manner and at such rate as in the judg- <br /> <br />ment'of the Commission will insure the completion of all nec- <br /> <br />. <br /> <br />essary investigations wi thin the period or the permit. <br />