My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02753
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02753
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:45:45 PM
Creation date
10/11/2006 11:19:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
10/19/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- <br />'--- -- <br /> <br />. .' . ; , -'0 () 1 G;) () <br /> <br />. <br /> <br />. <br /> <br />Advance Planning <br />On the FRUITLAND MESA PROJECT control surveys required for the <br /> <br />a~rial mapping contract (negotiated earlier) were in progress. <br /> <br />Aerial photography of the project area has been flown on the <br /> <br />SAVERY-POT HOOK PROJECT. The photography will be used later in <br /> <br />securing five"foot contour mapping of the project area. This flying <br /> <br />was accomplished with funds ($2,400) obtained from the local conservancy <br /> <br />districts and the State of Colorado. Advance planning studies are bcing <br /> <br />undertaken in F. Y, 1966. <br /> <br />Advance planning activities on the BOSTWICK PARK PROJECT are contin- <br /> <br />uing consisting of water supply studies, preparation of the agricultural <br /> <br /> <br />economy and project Lands appendices, and writing of the project summary <br /> <br />. report. The report is scheduled for completion this calendar year. <br /> <br />Small Reclamation Pro,1ects Prop;ram <br /> <br />The ORCHARD CITY IRRIGATION DISTRICT PROJECT is essentially <br /> <br />cOIIIPleted. <br /> <br />. <br /> <br />I <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.