My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02750
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:43 PM
Creation date
10/11/2006 11:19:40 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.600.20
Description
Fryingpan-Arkansas Project - Studies - Environmental Studies
State
CO
Basin
Arkansas
Water Division
5
Date
4/16/1975
Author
US DoI BoR
Title
Final Environmental Impact Statement Supplement, Part I
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-,.., ("......" <br />~4u~; <br /> <br />. <br /> <br />Access roads will be required from existing roads to the pumping <br />plants and other major structures. (See Figure 11-4 and 11-5.) <br />Access over existing farm roads will be used for the less frequently <br />visited structures such as surge tanks, blowoffs and air valves. <br /> <br />Clearing for the conduit, pumping plants, and other structures will <br />total about 800 acres. Applicable areas will be revegetated and or <br />rehabilitated as needed. <br /> <br />A permanent easement about 60 feet wide will be acquired for the <br />length of the conduit and lateral totaling 320 acres. A temporary <br />easement averaging about 90 feet wide totaling 480 acres will be <br />needed for construction in addition to the permanent easement. <br />Additional easements will be required at major structures. An <br />estimated 30 acres will be acquired in Fee Title for permanent major <br />structures. <br /> <br />It is anticipated that three construction contracts will be awarded <br />for construction of the Fountain Valley Conduit. It is planned that <br />the construction will span a 36-month period with an estimated <br />maximum employment of 300 construction workers. The contractors <br />will be required to provide their own construction camps. <br /> <br />. <br /> <br />Types of equipment to be used in construction of the Fountain Valley <br />Conduit include air compressors, backhoes, bulldozers, compactors, <br />cranes, dragline excavators, graders, hoists, jackhammers, loaders, <br />concrete mixers, scrapers, tractor-trailers, trucks, trenching <br />machines, truck cranes, welding equipment, and water trucks. <br /> <br />Estimated fuel consumption for construction of the Fountain Valley <br />Conduit is 1,800,000 gallons and lubricant use is estimated at <br />35,000 gallons. <br /> <br />Water for construction purposes will be made available for Reach 1 <br />from Pueblo Reservoir. For Reaches 2, 3, the lateral, and the <br />pumping plants, the contractors will have to make agreements with <br />the local entities for water usage. Planned water use will be <br />primarily for compaction purposes and dust control. <br /> <br />The contract specifications may allow the contractor to use the <br />following pipe types. <br /> <br />1. Concrete pressure pipe <br />2. Steel pipe <br />3. Pretensioned concrete pipe <br /> <br />. <br /> <br />11-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.