Laserfiche WebLink
<br /> <br />Glen Canyon Dam lel1 spillway conslrucllon <br /> <br />Strawberry Bay Campground <br />Facilities <br />Sheep Creek-Rays Valley Road <br />Duchesne Office Complex <br />Currant Creek Road Aggregate <br />Production <br />Soldier Creek Dam-Righi Abutment <br />Drainage <br /> <br />82 <br />100 <br />99 <br /> <br />100 <br /> <br />Chip and Seal Coal Striping and Miscellan- <br />eous Improvements lor Strawberry Reser- <br />voir Recreation Area contract was awarded <br />August 29, 1984, for $353,910, On the <br />Diamond Fork Power System, the Sixth <br />Water Flow Through alternative was select- <br />ed as the recommended plan since results <br />of a market test showed insufficient Interest <br />in non-Federally financing of the 1, t 82.4 <br />MW Fifth Water Pumped Storage alterna- <br />tive, The Sixth Water Plan would develOp <br />approximately 166,2 MW at conventional <br />tlow-fhrough hydropower and would gener- <br />ate an Average of 362,200 MW of energy <br />annually, The Diamond Fork Power System <br />Final EnVltonmentallmpact Statement was <br />scheduled to be filed in October 1984, <br /> <br />8 <br /> <br />44 <br /> <br /> <br />- <br /> <br /> <br />Welding lwo halves togelher 01 the norlh trastlrack on the <br />tI<'lvellng Weller screen Grand Valloy Unit <br /> <br />Steel forms for Strawberry Tunnel Inlet Reh<'lbililalion <br /> <br />Estimated Contruction Costs of Colorado River Storage Project <br />and Participating Projects (Section ~ and Section 8 Facilities with <br />Projected Increases from 1956 (Initial) to <br />Project Completion Cost Projections as of <br />September 30, 1984,) <br /> <br />60 <br />55 <br />5,0 <br />4,5 <br />4,0 <br />3,5 <br />3,0 <br />2,5 <br />2,0 <br />1.5 <br /> <br /> <br />1.0 <br /> <br />,5 <br />,0 <br /> <br />'Only $l60M,lllon was 1n'11allYilPNoproilled <br />byCOOgfess <br />'Dete,red indefInItely In 1962 <br />'De,1\Jlllo"led In 1971 <br />