My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02745
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:41 PM
Creation date
10/11/2006 11:19:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1984
Author
USDOI
Title
28th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />WO!" conllrlllCS on An;hiill f!l.'III,lGl' C('nl~'f <br /> <br />next two filling stages to insure the sat est <br />filling procedures possible <br /> <br />The Dolores Tunnel and Canal was com- <br />pleted and accepted In July 1 984, The <br />contractor working on the Great Cut Pump- <br />ing Plant had completed about 34 percent <br />ot the work by the end ot August 1984 <br />House Creek Road was about 50 percent <br />completed at the end 01 the construction <br />season, Notice to proceed was given on <br />the Dove Creek Canal. Reach 1 , By the end <br />of August 1984, the work was about 50 <br />percent complete <br /> <br />An award for the $2,9-million Anasazi <br />Helltage Center was given in May 1984, <br />The work was about 13 percent complete <br />at the end of August 1984, The 40,500- <br />square-foot building which will contain a <br />theater, storage rooms, a foyer, and a <br />reception center, will be a museum to <br />house ancient artilacts of the Anasazl <br />Indians, Reclamation has already spent <br />over $9 million to recover archeological <br />data from the Dolores Valley, <br /> <br />A $1 O-million construction contract was <br />awarded for Reacl1 1 01 Dove Creek Canal <br />in Montezuma County, Many other con- <br /> <br /> <br />Workmen prepare forms lor concrete placement lor <br />retdHllnq wall, Gralld Valley Unit <br /> <br />tracts were awarded and were in progress <br />on the Dolores Project <br />Dallas Creek Project: The contractor at <br />Ridgway Dam has begun the Stage 2 phase <br />of the dam construction, Foundation con- <br />struction included placing ot the dam em- <br />bankment and construction ot concrete <br />structures, By the end at the year the <br />contractor was approximately 34 percent <br />complete, <br /> <br />Clearrng of Ridgway Reservoir work started <br />In May 1984 and was completed in August <br />at a cost ot $146.749, <br />Central Utah Project: Bonneville Unit -At <br />Stillwater Tunnel, the contractor completed <br />the tunnel lining and was doing the backtill <br />grouting The work was about 97 percent <br />complete by the end of August 1984, Hades <br />and Rhodes Tunnels were completed, <br /> <br />The foundation excavation work at Upper <br />Stillwater Dam was completed, Drilling, <br />blasting, and excavation ot the dam toun- <br />dation was about 12 percent complete in <br />August, The contract for sand and aggre- <br />gate production for the dam was about 80 <br />percent completed by the same time, <br /> <br /> <br />Concrete and rock from rollel compacted concrete test <br />seCllon. Upper Stillwater DWTl <br /> <br />Strawberry Tunnel Inlet Rehabilitation was <br />completed, The contractor completed <br />about 95 percent of the work on Vat Diver- <br />sion Dam and West Fork Pipeline, A $5,7- <br />million contract was awarded in June for <br />the North Fork Siphon: notice to proceed <br />was given in August. <br /> <br />Other work In progress or completed on <br />the Bonneville Unit includes <br /> <br />Feature <br /> <br />Percent <br />Complete <br /> <br />Jordan Aqueduct, Reach 4 & <br />Alpine Aqueduct, Reach 3 27 <br />Utah Projects Office Complex 100 <br />Clearing Strawberry Reservoir 17 <br />Exploratory Drilling, Monks <br />Hollow Dam and Reservoir 0 <br />Strawberry Administrative Site <br />Development 21 <br />Haws Point Access Road and Day <br />Use Areas, West Side Road Repair, <br />and Soldier Creek Dam Fisherman <br />Access Areas 75 <br />Explorafory Drilling - <br />Jordanelle Damsite 82 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.