Laserfiche WebLink
<br />I' <br />1-:- <br /> <br />. , <br /> <br />. <br /> <br />. <br /> <br />001753 <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br /> <br />68-2 Meeting <br /> <br />Construction <br /> <br />On May 19, 1968, water impounded behind Morrow Point Dam, <br />the second dam of the Curecanti Unit near Gunnison, re~ched a depth <br />of 231 feet. About 900 cubic feet per second are being released <br />through the dam outlet works for downstream use. The turbines, <br />generators and much of the other electrical equipment for the power- <br />plant are being fabricated or are completed. Construction of Crystal <br />Dam and Powerplant just downstream from Morrow Point will be under- <br />taken when funds become available. <br /> <br />Construction has been resumed on the Silver Jack Reservoir <br />Dam of the Bostwick Park Project near Montrose. Embankment operations <br />should be completed in 1969. Present fund limitations may make it <br />necessary to delay initiation of work on the Project lateral system. <br /> <br />Feasibilitv Investiqations <br /> <br />Review comments on the June 1967 proposed feasibility <br />report, Battlement Mesa Project, near Collbran have been received <br />from most state and federal agencies. The final report will now be <br />prepared and submitted to Washington for further action. <br /> <br />Feasibility designs and estimates have been completed for <br />Sharrard Park and Kobe Pumping Plants, Roan Creek Diversion Dam, <br />and Mt. Logan Dam for the Bluestone Project near Grand Junction. <br />Plan formulation studies are nearly complete for the Una Reservoir <br />portion of the report. Data for this feature will be presented in <br />reconnaissance detail with the recommendation that initial construc- <br />tion on this feature be delayed until oil shale or related industries <br />dictate the need. Una Dam, Reservoir and Powerplant would provide <br />river control, power development, fishery and recreation, water <br />pollution control, and municipal and industrial water development. <br />Financial and economic analysis studies have been initiated. Work <br />by the cooperating agencies is behind schedule, but it is anticipated <br />the date of June 1968 for the field draft of the proposed feasibility <br />report can be met. <br /> <br />On the Grand Mesa Project near Delta plan formulation <br />studies, water supply studies, geological investigations, collection, <br />of agricultural economy data, and the preparation of design data are <br />in progress. It is now anticipated that completion of the proposed <br />