Laserfiche WebLink
<br />010941 <br /> <br />,.... <br /> <br />",." <br /> <br />3 <br /> <br />HERBERT 8. SANDS <br />DENVER,COLORADO <br /> <br />The kil~latthourB furnished to ultimate consw"ers in Colorado <br /> <br />in the year 1941 amOlmted to 195,313,564, "'hile the kilowatthours gener- <br /> <br />ated were 169,072,434, which Bh~lS an excess of energy over the energy <br /> <br />genera ted in the teni tory during the year of 26,241,130 kilowa tthours. <br /> <br />This excess energy waB generated beyond the limits of the drainage area <br /> <br />and transmitted into the drainage area and dis pensed through the foll~l- <br /> <br />ing ag;encies: <br /> <br />The Public Service Company of Colorado at Leadville received <br /> <br />17,559,000 kwh. from the central system of the Public Service Company of <br /> <br />Colorado. <br /> <br />The Public Service Company of Colorado at Salida received <br /> <br />5,015,690 kwh. This energy was brought into the Salida area from the <br /> <br />generating plant of the Public Service Company located at Alamosa. <br /> <br />The Trinidad Electric Railway, Transmiss ion, and Gas Company <br /> <br />at Trinidad received 3,670,440 kwh. This was brought in from the plant <br /> <br />of the New Mexico P~ler Company located at DawBon, New Mexico. <br /> <br />Table A ShOWB a total generating capaci~ of 76,168 kw. There <br /> <br />is a small amount of energy generated in the basin that is transmitted <br /> <br />beyond the limits of the basin. The service .furnished to Larkspur by the <br /> <br />Mountain utilities Corporation is purchased from the Ci~ of Colorado <br /> <br />Springs. <br /> <br />The energy furnished to Arriba and Stratton, which are outside <br /> <br />the drainage area, is generated at Hugo, which is inside the drainage <br /> <br />urea. <br />