Laserfiche WebLink
<br />LA <br /> <br />In general, I would recommend that floodplain properties which flood <br />at lower flows would be higher priority than those which require <br />higher flows; depressions that are "easily connectable and <br />drainable" would be higher priority than terraces; and areas with <br />properties available on both sides of the river would be higher <br />priority than areas with property available only on one side of the <br />river. All candidate properties would need to pass the screening <br />tests, of course. <br /> <br />For some of the properties which contain depressions, sites could be <br />constructed and managed in a manner similar to Old Charlie Wash or <br />that proposed for Leota L-7. For other depressions and for <br />terraces, no construction or management may be necessary, except <br />when removal of structures (e.g., dikes, levees, rip-rap, etc.) is <br />warranted. <br /> <br />VII. Task Description (FY 1995) <br /> <br />I. Land Acquisition Group meeting to discuss acquisition options <br />and strategies for Green River floodplain properties between <br />Brennan Bottom and Dinosaur National Monument (Jensen). <br /> <br />2. Ident ify and contact owners of selected properties, to <br />determine if they would be interested in some form of <br />agreement. <br /> <br />3. Conduct appraisals. <br />4. NEPA compliance. <br /> <br />5. Negotiation process. <br /> <br />6. Acquisition process. <br /> <br />VIII. Study Schedule <br /> <br />Task 1. <br />Task 2. <br />Task 3. <br />Task 4. <br />Task 5. <br />Task 6. <br /> <br />April 1995 <br />June 1995-September 1996 <br />June 1995-September 1996 <br />June 1995-September 1996 <br />FY 96 - FY 97 <br />FY 96 - FY 97 <br /> <br />IX. FY 95 Work <br /> <br />-Description of Work <br />See above. <br />-Deliverables (due date) <br />Reports of findings <br />-Budget <br />$90.61K <br /> <br />Dec 1995 <br /> <br />5 <br />