My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02694
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:27 PM
Creation date
10/11/2006 11:18:00 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.C.4
Description
UCRBRIP Flooded Bottom Lands
Basin
Colorado Mainstem
Date
1/1/1995
Author
UCRBRIP
Title
Floodplain Habitat Restoration - 1995 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l/\ <br /> <br />VI. Study MethodsjApproach <br /> <br />Transaction for proposed acquisition of a floodplain property <br />(2hrsj2days means it will take 2 hours of actual time but allow 2 <br />days to accomplish the task). <br /> <br />Typical <br /> <br />Complicated <br /> <br /> DescrlPtion Transaction Transaction <br />Review request to acquire property 2hrsj2days 2hrsj2days <br />(assign to staff or return for <br />additional information). <br />Acquire and review title report 3hrsj3wks 3hrsj3wks <br />(assume we already have a BPA). <br />Appraisal Process: <br />Use staff appraiser 45-60 days na <br />Review 5daysj2wks <br />Use fee appraiser <br />Interview/contract l2hrs/lOdays l2hrsjlOdays <br />Appraisal report 45 to 60 days 90-lBO days <br />Review 5days j2wks 5daysj2wks <br />Prepare Negotiators Package 6hrsj5days l2hrs/5days <br />(offer letter, contract, etc,) <br />Negotiations l2hrsj3wks 40hrs/gO days <br />Title clearance, legal review, IOhrsj2wks 30hrsj6 months <br />closing <br /> <br />-A complicated case would be a site that is ripe for developing into <br />a gravel mining operation and that has lots of title encumbrances. <br /> <br />Assumptions: <br />-Acquisition based on willing seller. <br />-All preacquisition planning is complete. <br />-Memo sent to BR requesting acquisition of all or a portion of <br />a property (which includes a costjcharge number, a legal <br />description and tract map of the required area, a reference to <br />NEPA, and a completed HzMat survey). If BR is asked to do the <br />afforementioned (e.g., NEPA, HzMat, legal description, tract <br />map) then time required will increase Significantly. <br /> <br />Allow 90 days for the first scenario and 9 months for the second <br />scenario. Certain portions of the process overlap (e.g., title and <br />appraisal processes can proceed simultaneously). <br /> <br />p <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.