Laserfiche WebLink
<br />\-\ G-- <br /> <br />Task 2. Site restoration <br /> <br />1995-1997 <br /> <br />Site design and/or restoration are scheduled to begin in FY 95 <br />for: <br /> <br />-Leota L-7 <br />-Lower Green River (possible restoration of flows) <br />-Walter Walker <br />-Golf-Course West <br />-Gravel pit ponds at 29 5/8 Road <br /> <br />Task 3. Evaluation of results <br /> <br />1995-1997 <br /> <br />IX. FY 95 Work <br /> <br />-Description of Work <br />Tasks 1-3. See above. <br /> <br />-Deliverables (due date) <br /> <br />Report of findings <br /> <br />Dec 1995 <br /> <br />-Budget <br />$200K <br /> <br />For gages, transects, surveying, topo-mapping, aerial photography, <br />labor, materials, etc. <br /> <br />X. Budget Summary <br />FY 1995 $200K <br />FY 1996 $200K <br />FY 1997 $200K <br /> <br />Total: $600K <br /> <br />4 <br />