My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02694
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:27 PM
Creation date
10/11/2006 11:18:00 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.C.4
Description
UCRBRIP Flooded Bottom Lands
Basin
Colorado Mainstem
Date
1/1/1995
Author
UCRBRIP
Title
Floodplain Habitat Restoration - 1995 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />G-T> <br /> <br />VIII. Study Schedule (start/end by Task) <br /> Task 1. 2/95~5/95 <br /> Task 2. 4/95~9/95; 10/95-9/96 <br /> Task 3. 3/95~B/95 <br /> Task 4. 5/95~9/95 <br /> Task 5. 10/96~3/97 <br />IX. FY 95 Work <br /> Budget estimate (by tasks) <br /> <br />Description of work: Conduct topography/surveying of immediate site and <br />area adjacent to site--prepare a contour map with <br />ground control points for future reference <br /> <br />Deliverables (due date): 5/95 <br />Task 1: Topographic Mapping <br /> <br />Task Total <br /> <br />$ 13, 500 <br />$ 13,500 <br /> <br />(- v."" <br />",,~~v.\Oj.J \ <br />G-L....O<ll'I.. ~) <br />~ '"'~.." <br />to <br /> <br />Note: Task 1: Funds identified for topography mapping to be directed <br />Bureau of Reclamation, Survey Section of the Field <br />Engineering Branch, Grand Junction Project's Office. <br /> <br />Tasks 2 & 4: (Funds to be directed to USFWS, CRFP, Grand Junction) <br /> <br />Description of work: <br /> <br />provide study oversight; conduct fishery <br />inventory; pond reclamation, if necessary; <br />hydrological monitoring <br /> <br />Deliverables (due date): Task 2: 9/95 <br /> <br />Tasks 2 and 4: Biological Inventory/Hydrological Monitoring; Site Design, <br />Engineering, and Construction <br /> <br />1. Labor <br /> Study Oversight (Tasks 1 and 4) <br /> General FWS Site Coordination $ 3,500 <br /> Biological Monitoring/Hydrological Monitori n9 $ 3,500 <br /> (Task 2) <br /> Pond Reclamation $ 2,000 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.